Skip to main content
CityRuleLookup
🌍 Environmental Rules/Stormwater Management

Stormwater Management: Galt vs McClellan Park

How do stormwater management rules compare between Galt, CA and McClellan Park, CA?

Galt has fewer restrictions than McClellan Park.

Galt, CA

Sacramento County

Some Restrictions

Galt operates under a Phase II Small MS4 NPDES permit issued by the State Water Resources Control Board. New development and significant redevelopment must implement post-construction stormwater controls following the Central Valley RWQCB requirements.

View full Galt rules β†’

McClellan Park, CA

Sacramento County

Heavy Restrictions

Sacramento County operates under a joint NPDES MS4 Permit (R5-2016-0040) with the City of Sacramento and other co-permittees. County Code Chapter 15.12 implements stormwater pollution prevention. New and redevelopment projects over 1 acre (or smaller in some cases) must comply with Post-Construction Stormwater Standards including LID and hydromodification controls.

View full McClellan Park rules β†’

Key Facts Comparison

FactGaltMcClellan Park
PermitPhase II Small MS4 NPDESNPDES R5-2016-0040
RegulatorCentral Valley RWQCB-
New Development5,000 sq ft impervious trigger-
BMPsSite, source, and treatment-
Illicit DischargeProhibited into storm drain-
County Code-Chapter 15.12
SWPPP-1+ acre disturbance
LID-5,000+ sq ft impervious
Penalty-Up to $10,000/day

Highlighted rows indicate differences between cities.

Galt FAQ

Can I wash my car in the driveway in Galt?

Residential car washing with biodegradable soap is generally allowed, but soapy runoff should be minimized. Commercial car washes must direct wastewater to the sanitary sewer.

Where does Galt storm water go?

Storm drains discharge untreated to local creeks and ultimately to the Cosumnes River and Delta system.

McClellan Park FAQ

Can I wash my car in my driveway?

Residential car washing is allowed but soapy water should be directed to landscaped areas, not the street or storm drain.

Do I need a SWPPP for my home remodel?

Only if construction disturbs 1 acre or more. Smaller sites still need erosion and sediment control Best Management Practices.

Want to add a third city?

Use our full comparison tool to compare up to three cities.

Open Comparison Tool