Skip to main content
CityRuleLookup
☀️ Solar Energy/Panel Permits

Kent vs Redmond

How do panel permits rules compare between Kent, WA and Redmond, WA?

Redmond has fewer restrictions than Kent.

Kent, WA

King County

Some Restrictions

Kent uses the Washington State Building Code for rooftop solar. Most residential PV systems need an electrical permit from L and I and a structural review from Kent.

View full Kent rules →

Redmond, WA

King County

Few Restrictions

Redmond issues streamlined solar permits for rooftop PV systems through Development Services. Permits require electrical and structural review and follow the WA State Energy Code.

View full Redmond rules →

Key Facts Comparison

FactKentRedmond
Electrical permitWA L and I-
Building permitKent structural check-
Fire pathwayIFC Ch 12 setbacks-
Net meteringPSE under RCW 80.60-
Residential permit-Electrical plus structural
State code-WA Energy Code
Streamlined-Available for rooftop PV
Utility-PSE interconnection required

Highlighted rows indicate differences between cities.

Kent FAQ

Do I need a permit to install Kent rooftop solar?

Yes, at minimum an L and I electrical permit and typically a Kent building permit for structural and fire review.

Can I DIY install solar?

A licensed electrical contractor must do the interconnection work; homeowners can install some structural components under permit.

Redmond FAQ

Do I need a permit for solar panels in Redmond?

Yes, an electrical permit is always required and a structural or building permit is required for the roof mounting.

How long does a Redmond solar permit take?

Typical residential rooftop PV permits are reviewed within a few weeks and many qualify for a streamlined over-the-counter process.

Compare other topics

See how Kent and Redmond compare on other ordinance categories.

Want to add a third city?

Use our full comparison tool to compare up to three cities.

Open Comparison Tool