Skip to main content
CityRuleLookup
πŸš— Parking Rules/EV Charging

EV Charging: Lakewood vs Tacoma

How do ev charging rules compare between Lakewood, WA and Tacoma, WA?

Lakewood and Tacoma have similar restriction levels.

Lakewood, WA

Pierce County

Some Restrictions

Pierce County requires new development in unincorporated areas to provide electric vehicle charging infrastructure under PCC 18A.35.040, following Table 18A.35.040-3 for EV charging stations, EV-Ready, and EV-Capable spaces. Equipment must meet RCW Chapter 19.28 and NEC Article 625, with exceptions for small parking areas and sites without power.

View full Lakewood rules β†’

Tacoma, WA

Pierce County

Some Restrictions

Pierce County requires new development in unincorporated areas to provide electric vehicle charging infrastructure under PCC 18A.35.040, following Table 18A.35.040-3 for EV charging stations, EV-Ready, and EV-Capable spaces. Equipment must meet RCW Chapter 19.28 and NEC Article 625, with exceptions for small parking areas and sites without power.

View full Tacoma rules β†’

Key Facts Comparison

FactLakewoodTacoma
EV CodePCC 18A.35.040(9)PCC 18A.35.040(9)
Circuit Requirement40-amp 208/240-volt40-amp 208/240-volt
Accessible EV Stations10% of accessible spaces10% of accessible spaces
Small-Lot ExceptionUnder 10 spacesUnder 10 spaces
StandardsRCW 19.28, NEC Article 625RCW 19.28, NEC Article 625

Highlighted rows indicate differences between cities.

Lakewood FAQ

Does new development in Pierce County need EV charging?

Yes. Under PCC 18A.35.040, new buildings and accessory structures in unincorporated Pierce County must provide EV charging stations, EV-Ready, and EV-Capable spaces per Table 18A.35.040-3, unless an exception such as the under-10-space rule applies.

What electrical capacity is required for EV spaces?

Each EV-Ready space and EV charging station needs a minimum 40-ampere dedicated 208/240-volt branch circuit, and EV-Capable spaces need a listed raceway sized for the same, per PCC 18A.35.040 and NEC Article 625.

Tacoma FAQ

Does new development in Pierce County need EV charging?

Yes. Under PCC 18A.35.040, new buildings and accessory structures in unincorporated Pierce County must provide EV charging stations, EV-Ready, and EV-Capable spaces per Table 18A.35.040-3, unless an exception such as the under-10-space rule applies.

What electrical capacity is required for EV spaces?

Each EV-Ready space and EV charging station needs a minimum 40-ampere dedicated 208/240-volt branch circuit, and EV-Capable spaces need a listed raceway sized for the same, per PCC 18A.35.040 and NEC Article 625.

Want to add a third city?

Use our full comparison tool to compare up to three cities.

Open Comparison Tool