Lakewood, WA Parking Rules: EV Charging (2026)
Key Facts
- Credit per station
- 1 parking space reduction
- Reduction cap
- 5% of total required parking
- Combined incentive cap
- 5% across all incentives
- Governing section
- LMC 18A.80.060(G)
- Approval process
- Site plan review by Director
Summary
Lakewood, Washington rewards developers who install electric vehicle charging stations with a parking-count credit under LMC 18A.80.060(G): each charging station lets the required parking total drop by one space, capped at 5 percent of the total required spaces for the site. The credit stacks with the code's other parking-reduction incentives up to that same 5 percent ceiling.
G. Electric Vehicle Charging Parking Provisions. For every electric vehicle charging station, provided the required number of parking spaces may be reduced by an equivalent number, provided the total reduction does not exceed five (5) percent of the total required parking spaces. For example, if forty (40) parking spaces are required and two (2) electric vehicle charging stations are provided, the total required parking may be reduced to thirty-eight (38) spaces, yielding thirty-six (36) “regular” parking spaces and two (2) electric vehicle charging parking spaces. Note that in this example the total reduction may not be in excess of two (2) spaces (40 × 5% = 2), so if three (3) electric vehicle charging stations were provided instead, the total reduction in required parking would still be two (2) spaces, yielding thirty-five (35) “regular” parking spaces and three (3) electric vehicle charging parking spaces.
Official source re-checked September 8, 2026: no newer edition of the code had been published (publisher’s edition: current through Ordinance 852, passed June 15, 2026).
Full Breakdown
060, Parking Incentives, lets the Planning and Public Works Director reduce a development's required off-street parking count in exchange for design choices the City wants to encourage, and subsection G targets electric vehicle charging. For every EV charging station a project installs, the number of required parking spaces may be reduced by one, but the total reduction from EV charging credits cannot exceed 5 percent of the site's total required parking. The code walks through the math directly: if a project needs 40 spaces and installs two charging stations, the requirement drops to 38 spaces (36 regular spaces plus the 2 EV spaces) because two stations fall under the 5 percent cap (40 x 5% = 2).
Install a third station instead, and the total reduction still tops out at two spaces, so the project would have 35 regular spaces plus three EV charging spaces, for 38 total. The same chapter caps the combined effect of all its parking incentives, including the separate credit for preserving a significant or heritage tree under subsection I, at 5 percent of total required parking when stacked together. 5-space credit for each structured parking space, and shared-use or off-site parking arrangements approved by the Director. 80, and the reduced count becomes the enforceable minimum for the approved project.
Violations & Fines
Parking counts approved under LMC 18A.80.060, including the EV charging credit, become a binding condition of the site plan approval. Under LMC 18A.20.105, failing to build or maintain the approved parking configuration is a Title 18A violation enforced by the City Manager as a Class 2 civil infraction under Chapter 1.48 LMC, and the Planning and Public Works Director may revoke or modify the permit if the approved conditions go unmet.
Frequently Asked Questions
How many parking spaces does an EV charging station save a Lakewood developer?
Can Lakewood's EV charging credit be combined with other parking incentives?
What is the maximum parking reduction for a 40-space Lakewood project with EV chargers?
Sources & Official References
Other rules in Lakewood
Compare Lakewood to another location·View the Washington parking rules overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.