Key Facts

Trigger threshold
Over half an acre disturbed, cumulative
Approving body
City Plan Commission or its agent
Single-family exemption
Non-subdivision single-family dwelling
Technical standard
CT Guidelines for Soil Erosion (1985)
Financial assurance
Completion bond required before work
Adopted
1985, under Public Act 83-388

Summary

New Britain's Zoning Ordinance requires a certified soil erosion and sediment control plan before any land development disturbing more than half an acre, cumulatively, in any zoning district. Section 230-145 exempts a single-family home built outside a subdivision and backs the certification with a completion bond posted with the City Plan Commission.

A soil erosion and sediment control plan shall be submitted with any application for development when the disturbed area or such development is cumulatively more than one-half acre. ... A single family dwelling that is not part of a subdivision of land shall be exempt from these soil erosion and sediment control regulations. ... The estimated costs of measures required to control soil erosion and sedimentation, as specified in the certified plan, shall be covered by a completion bond or other assurance acceptable to the Commission.

Full Breakdown

Section 230-145, the Soil Erosion and Sediment Control Regulations for Land Development of the City of New Britain, was adopted in 1985 under the state's Public Act 83-388 and still governs every disturbance-triggering project today. Section 230-145-10.30 sets the trigger: no land development that is cumulatively more than one-half acre in area may proceed in any district until the City Plan Commission or its appointed agent certifies a soil erosion and sediment control plan for it. Section 230-145-20.10 restates the same half-acre threshold specifically for the plan submission requirement, tying it to the application for development rather than to the parcel's total size.

Section 230-145-30.10 carves out one clear exemption: a single-family dwelling that is not part of a subdivision of land does not need a certified plan, even if the disturbed area exceeds half an acre. For everything else, Section 230-145-40 requires the plan to contain a narrative describing the development, a construction and grading schedule, design and installation details for erosion and sediment control measures and stormwater management facilities, and a surveyed site plan at a scale of at least 1 inch to 40 feet. Section 230-145-50 ties the plan's technical standards to the Connecticut Guidelines for Soil Erosion and Sediment Control (1985), letting the Commission approve alternate methods only with a technically sound justification.

Section 230-145-70.10 backs certification with a completion bond or other assurance the Commission accepts, sized from a cost breakdown the applicant submits with the application, and Section 230-145-70.20 bars site work from starting until that bond is posted and the plan is certified. Section 230-145-80 lets the Commission or its agent inspect the site during construction and release the bond only once a final report and inspection confirm the certified measures were installed as approved.

Violations & Fines

Starting land development over the half-acre threshold without a certified plan, or before the required completion bond is posted, violates Section 230-145-70.20. The Zoning Ordinance's general enforcement rule, Section 280-130, lets the city order the violation corrected within five days; continued noncompliance draws the Code of Ordinances § 1-15 penalty, up to $150 per day, each day a separate offense.

Frequently Asked Questions

When does New Britain require an erosion control plan?
Whenever a land development project cumulatively disturbs more than one-half acre in any zoning district. Section 230-145-10.30 and Section 230-145-20.10 both set that half-acre threshold, and the City Plan Commission or its appointed agent must certify the plan before the work can begin.
Is my new single-family home exempt?
Yes, if it is not part of a subdivision. Section 230-145-30.10 exempts a single-family dwelling that is not part of a subdivision of land from the certified erosion and sediment control plan requirement, even if the disturbed area exceeds half an acre.
Does the city require a bond for erosion control?
Yes. Section 230-145-70.10 requires the estimated cost of the erosion and sediment control measures to be covered by a completion bond or other assurance acceptable to the City Plan Commission, and Section 230-145-70.20 blocks site work from starting until that bond is posted and the plan certified.

Sources & Official References

Other rules in New Britain

All New Britain rules

Compare New Britain to another location·View the Connecticut environmental rules overview

Get notified when Erosion Control in New Britain, CT changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.