Grading and drainage in San Mateo are regulated under the city's building code (Title 23) and the NPDES Municipal Permit. Projects requiring grading permits must submit drainage plans. All projects creating or replacing 5,000+ square feet of impervious surface must meet stormwater treatment requirements.
The City of San Mateo regulates grading through the building code (Title 23) and manages drainage under its NPDES Municipal Permit obligations. A grading permit is required for earthwork exceeding specified thresholds. All projects requiring a demolition, grading, or building permit that involve site disturbance must submit an Erosion and Sediment Control Plan. Projects creating or replacing 5,000 or more square feet of impervious surface must meet stormwater treatment requirements. The city's hilly terrain on the western slopes and flat baylands on the east create distinct drainage challenges. Development must not increase stormwater runoff to downstream properties. The Public Works Department reviews grading and drainage plans at 650-522-7300.
Grading without a permit is a building code violation subject to stop-work orders and fines. Drainage alterations causing damage to downstream properties may result in civil liability and enforcement.
San Mateo, CA
San Mateo prohibits nuisance barking under the city's noise ordinance and animal control provisions. Owners must prevent habitual barking that disturbs neigh...
San Mateo, CA
San Mateo experiences aircraft noise from San Francisco International Airport (SFO), located approximately 3 miles north. The city cannot restrict FAA-contro...
San Mateo, CA
San Mateo regulates amplified sound under SMMC Section 7.30.080. Handheld amplified sound equipment cannot exceed 10 watts. All amplified sound must comply w...
San Mateo, CA
San Mateo limits permitted construction to 7 AMβ7 PM weekdays, 9 AMβ5 PM Saturdays, and noonβ4 PM Sundays/holidays. Equipment cannot exceed 90 dB at 25 feet....
San Mateo, CA
San Mateo specifically regulates leaf blower operation under Chapter 10.80 in addition to the general noise ordinance. Leaf blowers must comply with both the...
San Mateo, CA
Fences up to 7 feet in San Mateo generally do not require a building permit if they comply with zoning regulations. Fences over 7 feet require a building per...
See how San Mateo's grading & drainage rules stack up against other locations.
Help us keep this page accurate. If you notice an error or outdated information, let us know.