San Mateo County requires a Grading Permit from Planning & Building for projects involving more than 250 cubic yards of cut and/or fill, or any grading on slopes over 20%, or grading within 100 ft of a watercourse. Drainage design must direct runoff away from structures and must not adversely redirect water onto neighboring properties. Retaining walls over 4 feet in height need separate engineering and permits. Pre-site erosion-control and tree-protection inspection may be required.
Grading permits are governed by the County's grading ordinance (Title 6) in conjunction with the California Building Code Chapter 18 (Soils and Foundations) and Appendix J (Grading). Threshold for permit: more than 250 cubic yards of cumulative cut and/or fill, OR any grading on slopes 20% or steeper, OR grading within 100 feet of a watercourse, OR cut/fill over 3 feet in height, OR any grading in the Coastal Zone. Grading permit applications require: topographic survey, grading plan showing existing and proposed contours, drainage plan, erosion and sediment control plan, geotechnical report (for sites on fill, steep slopes, or with liquefaction potential), hydrology analysis (if within 100 ft of watercourse), and tree protection/removal plan. Drainage from the site cannot be redirected onto a neighboring parcel in a way that causes damage (common-law nuisance plus Civil Code §§1008, 3479). Retaining walls over 4 feet in height or supporting a surcharge (driveway, slope) require structural engineering stamped by a California PE and a building permit. Large grading projects may need to implement the Construction General Permit (1+ acre disturbance) with a SWPPP. Compaction testing required for structural fill (typically 90-95% relative compaction).
Unpermitted grading: stop-work order, retroactive permit at 2-3x fee, fines $250-$2,500 per §1.04. Redirecting drainage onto neighbor: common-law nuisance plus corrective action required. Slope failure from improper grading: civil liability for damages plus Regional Board enforcement if sediment enters waterway. Unpermitted retaining wall over 4 ft: demolition or retroactive engineering.
Other ordinances people look up for this city. Green dot = verified primary-source excerpt.
South San Francisco, CA
South San Francisco regulates noise under SSFMC Chapter 8.32 (Noise Regulations). The ordinance prohibits loud, unnecessary noise disturbing neighborhood pea...
South San Francisco, CA
South San Francisco prohibits nuisance barking under the general noise ordinance (SSFMC Ch. 8.32). Animal control in SSF is provided by Peninsula Humane Soci...
South San Francisco, CA
South San Francisco permits construction with a valid city permit weekdays 8 AM–8 PM, Saturdays 9 AM–8 PM, and Sundays/holidays 10 AM–6 PM. Equipment noise c...
South San Francisco, CA
South San Francisco enforces CVC 72-hour abandonment rule, street sweeping restrictions, and residential time-limit zones. The city is densely developed (bio...
South San Francisco, CA
South San Francisco requires vehicles to be parked on legal paved parking areas. Blocking public sidewalks is prohibited. Garage conversion ADUs do not requi...
South San Francisco, CA
South San Francisco restricts large commercial vehicles from parking in residential zones. South San Francisco's industrial character means commercial vehicl...
Side-by-side rule comparisons with other cities in San Mateo County.
See how other cities in San Mateo County handle grading & drainage.
See how South San Francisco's grading & drainage rules stack up against other locations.
Quick Compare
Help us keep this page accurate. If you notice an error or outdated information, let us know.