Massachusetts strictly limits late fees. Under M.G.L. c. 186 § 15B(1)(c), no lease or rental agreement may impose any interest or penalty for late rent until the rent is at least 30 days overdue. A late fee charged before that 30-day mark is unlawful.
M.G.L. c. 186 § 15B(1)(c) provides that "No lease or other rental agreement shall impose any interest or penalty for failure to pay rent until thirty days after such rent shall have been due." This means a Massachusetts landlord cannot charge a late fee, penalty, or interest the moment rent is a few days late — the rent must be at least 30 days overdue before any such charge can be imposed. The statute does not set a maximum dollar amount or percentage for the late fee itself; its core restriction is the 30-day waiting period. A lease clause purporting to charge a late fee sooner is contrary to the statute and unenforceable.
No fixed statutory fine; a late fee or interest charged before rent is 30 days overdue violates § 15B(1)(c) and is unenforceable, and the tenant may contest or recover an improperly collected charge.
Other ordinances people look up for this city. Green dot = verified primary-source excerpt.
Newton, MA
Industrial and commercial noise in Newton must meet property-line decibel limits by zoning district, with mechanical equipment, HVAC, and loading docks close...
Newton, MA
Newton follows the state stretch energy code requiring EV-ready wiring in new construction. Residential Level 2 chargers need electrical permits; commercial ...
Newton, MA
Under MGL c.90 s.22D, Newton can tow vehicles left on public ways for more than 72 hours. Unregistered or inoperable vehicles on private property must be sto...
Newton, MA
Newton requires curb cut permits from DPW for new driveways, with maximum widths of 20 feet for single-family homes. Impervious surface coverage is limited b...
Newton, MA
Massachusetts MGL Chapter 49 governs boundary fences between neighbors, establishing shared maintenance where fences are mutual and providing fence viewer pr...
Newton, MA
Retaining walls in Newton over 4 feet in height measured from footing to top require a building permit and engineered design per 780 CMR.
See how Newton's late fees & grace periods rules stack up against other locations.
Help us keep this page accurate. If you notice an error or outdated information, let us know.