Stormwater Management
Tucson Code § 26-40 bans any discharge that contributes a pollutant to stormwater, including illicit connections, dumping materials that block flow, and failing to file required AZPDES/NPDES paperwork. Violations trigger corrective-action orders and can be prosecuted as civil infractions or misdemeanors.
Tucson Stormwater Discharge Prohibitions
Significant RestrictionsTucson Code § 26-40
Sec. 26-40. Prohibited discharges. The following are prohibited: (1) Any discharge that is a source of pollutants; (2) Allowing or causing any discharge that contributes a pollutant to stormwater; (3) Any discharge that contributes to a violation of the city's Municipal Stormwater Permit, regardless of whether that discharge is covered under, and is in compliance with, an AZPDES/NPDES permit; (...
Erosion Control
Any site in Tucson that has been graded must control erosion under UDC Technical Standards Manual § 2-01.11.0: cut and fill slopes need planting, check dams, cribbing or riprap installed before final grading approval. Sites of one acre or more that sit idle more than 60 days after grubbing must be native-seeded or dust-treated within 30 days, per PDSD.
Tucson Erosion Control Rules for Graded Sites
Some RestrictionsTucson UDC Technical Standards Manual § 2-01.11.0
2-01.11.0 EROSION CONTROL 11.1 Slopes The faces of cut and fill slopes shall be prepared and maintained to control against erosion. This control may consist of effective planting. The protection for the slopes shall be installed as soon as practicable and prior to calling for final approval. Where cut slopes are not subject to erosion due to the erosion-resistant character of the materials, suc...
Flood Zones
Building, filling, grading or altering a watercourse in a Tucson floodplain or erosion hazard area requires a floodplain use permit from the city engineer before work starts. Skipping the permit is a civil infraction carrying a $50-$2,500 fine, and deliberately obstructing flood flow can be prosecuted as a class 2 misdemeanor.
Tucson Floodplain Development Permit Rules
Significant RestrictionsTucson City Code § 26-11(a); § 26-11.3(a)
(a) Except as otherwise provided in these regulations, it shall be unlawful for any person to establish, erect, alter or relocate a use or structure in the regulatory floodplain or an erosion-prone area as described in section 26-11.1(2) without first obtaining a floodplain use permit from the city engineer. ... (a) Civil infraction: ... any person found responsible under this section shall b...
Vehicle Idling Restrictions
Tucson bars trucks from idling between 6:00 p.m. and 7:00 a.m. at Large Retail Establishments, stores over 100,000 square feet, as part of the noise-abatement design standard in UDC § 4.9.9.D.1.l; it's a development condition, not a citywide idling law.
Tucson Large Retail Truck Idling Limit
Some RestrictionsTucson UDC § 4.9.9.D.1.l
l. Noise Abatement The project shall provide a noise mitigation plan indicating how the noise initiated by the land use will be mitigated to comply with noise standards in Section 16-31, Excessive Noise, of the Tucson Code. Trucks shall not be left idling between the hours of 6:00 p.m. and 7:00 a.m.
Flood Elevation Requirements
In Tucson's floodway fringe, new construction must set the lowest floor, including any basement, at least one foot above the base flood elevation under City Code § 26-5.2(9). AO-zone residential work must instead reach the regulatory flood elevation, and a licensed surveyor or engineer must certify the framing elevation to the city engineer before the first slab pours.
Tucson Freeboard Rule: 1 Foot Above Flood Line
Some RestrictionsTucson City Code § 26-5.2(5), (9)
Development in the floodway fringe shall: ... (5) Not increase the base flood elevation more than one-tenth of a foot, as measured from the property boundary. ... (9) Place the lowest (including basement) floor one (1) foot above the base flood elevation. In an AO Zone, residential construction, new or substantial damage repairs or improvements, shall have the lowest floor, including basement, ...