Summary

Albuquerque requires erosion and sediment control for all construction and ground-disturbing activities under §14-5-2-11 and DPM Chapter 22. The city's Construction Stormwater Quality Section reviews and approves erosion control plans before grading permits, building permits, or work orders are issued. Projects involving more than 1.0 acres or 500+ cubic yards of soil must have an approved erosion control plan.

E. Erosion and Stormwater Pollution Control. All grading within the City of Albuquerque must be performed in a manner which prevents the movement of significant and damaging amounts of sediment onto adjacent property and public facilities by both water and wind, and minimizes the impacts to stormwater runoff quality. Every project involving the grading of more than 1.0 acres or the importation or excavation of more than 500 cubic yards of soil must be accompanied by an approved erosion control plan. To conform with EPA stormwater regulations, a Stormwater Pollution Prevention Plan shall also be provided for all grading of 1.0 acre or more. 1. Construction Phase: It is the responsibility of the contractor to implement the erosion and stormwater pollution control plans during the construction phase. Failure to do so promptly may result in a "stop-work order" being issued and maintained until repair and clean-up is completed to City Engineer satisfaction.

Source: DPM Chapter 22 — Drainage, Flood Control and Erosion ControlView official code

Full Breakdown

Erosion and sediment control plans must be submitted and approved before any ground disturbance begins. Required Best Management Practices include silt fences, sediment basins, vehicle tracking pads, inlet protection, and dust control. Albuquerque's arid climate makes wind erosion a significant concern alongside water erosion during monsoon season. Temporary stabilization must be achieved within 14 days of last disturbance. Permanent stabilization requires establishment of vegetation or permanent ground cover. The city inspects active construction sites for compliance with approved erosion control plans.

Violations & Fines

Failure to implement required erosion controls can result in stop-work orders from city inspectors. Sediment discharge to the storm drain system violates §14-5-2-11 and carries civil penalties. The New Mexico Environment Department may impose additional penalties for state permit violations. Repeated violations may affect future permit approvals.

Frequently Asked Questions

When is an erosion control plan required?
All projects involving grading of more than 1.0 acre or importation/excavation of more than 500 cubic yards of soil must have an approved erosion control plan before permits are issued.
What erosion controls are required?
Required BMPs include silt fences, sediment basins, vehicle tracking pads, inlet protection, and dust control measures. Controls must be installed before grading and maintained throughout construction.

Sources & Official References

Other rules in Albuquerque

All Albuquerque rules

Compare Albuquerque to another location·View the New Mexico environmental rules overview

Get notified when Erosion Control in Albuquerque, NM changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.