Louisville Metro requires grading permits for land-disturbing activities under LMCO and MSD regulations. Property owners must maintain positive drainage away from structures and must not divert stormwater onto neighboring properties. MSD reviews grading plans for projects exceeding the disturbance thresholds and requires drainage easements where necessary.
Louisville regulates grading and drainage through building and engineering codes. Grading permits required for excavation or fill over specified thresholds, typically 50 to 100 cubic yards. Site grading must direct drainage away from structures and not adversely affect neighboring properties. Drainage swales, French drains, and catch basins may be required. Retaining walls over 4 feet need engineering and separate permits. Compaction testing required for structural fill. Final grade must match approved plans. Property owners responsible for maintaining drainage facilities on their land.
Unpermitted grading: stop-work order and fines $250 to $2,500. Redirecting drainage to neighbors: corrective action required. Slope failure from improper grading: liability and remediation costs.
Louisville, KY
Louisville Metro Land Development Code Chapter 4 caps front-yard fences at 42 inches in Traditional form districts and 48 inches in Suburban districts. Side ...
Louisville, KY
Kentucky does not preempt residential rainwater harvesting and Louisville Metro has no ordinance restricting rain barrels or cisterns for outdoor use. Louisv...
Louisville, KY
Louisville Metro cannot require paid sick leave or paid family leave from private employers. Under Kentucky Restaurant Ass'n v. Louisville (Ky. 2016), KRS Ch...
Louisville, KY
Louisville Metro cannot enact local firearm ordinances β Kentucky Revised Statutes Section 65.870 expressly bars any city, county, or urban-county government...
Louisville, KY
Louisville Metro requires building, electrical, and (for in-ground pools) plumbing permits from Construction Review for any swimming pool over 24 inches deep...
Louisville, KY
Kentucky requires state contractors to use the federal E-Verify system to confirm employment eligibility under KRS 157.413. Louisville is not a sanctuary cit...
See how Louisville's grading & drainage rules stack up against other locations.
Help us keep this page accurate. If you notice an error or outdated information, let us know.