Skip to main content
CityRuleLookup

Montgomery County, MD Landscaping Rules: Rainwater Harvesting (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Trigger
Lots under 15,000 sq ft, or +400 sq ft additions
Design standard
1.5 inches of rain in 24 hours
Qualifying device
Rain barrel or cistern w/ slow release
Enforcing office
Dept. of Permitting Services Director
Violation class
Class A violation, County Code § 8-22

Summary

On lots under 15,000 square feet, Montgomery County lets builders satisfy the required runoff-control plan for a building permit with a rain barrel or cistern instead of conventional stormwater infrastructure.

These county ordinances apply to unincorporated areas of Montgomery County. Incorporated cities within the county may have their own rules that take precedence over county-level regulations.

The Director must not issue a building permit for any detached one- or two-family residential building located on a recorded lot smaller than 15,000 square feet... unless the plans provide for safe conveyance or control of any increased water runoff... approved drainage system means any method of safe conveyance from the property or storage on the property of on-site water runoff... using ... rain barrel, cistern with slow release or controlled pump discharge... Each approved drainage system must be designed to convey or control at least 1.5 inches of rainfall during a 24-hour period.

Source: RainScapes Rebates ProgramView official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: 2026 S-90: Montgomery County Code contains legislation effective through May 7, 2026 | Zoning Updated Effective: April 13, 2026 | COMCOR Regulations effective as of July 1, 2026).

Full Breakdown

Under County Code § 8-29B, the Director of Permitting Services won't issue a building permit for a detached one- or two-family home on a recorded lot under 15,000 square feet, or an addition that grows lot coverage by more than 400 square feet, unless the plans include an approved drainage system. A rain barrel or cistern with slow release or controlled pump discharge qualifies, alongside rain gardens, bioretention filters, dry wells, and similar devices. Whatever device is chosen must be engineered to convey or control at least 1.5 inches of rainfall in 24 hours, and the owner must certify installation and preserve the system afterward.

Violations & Fines

Building or altering a home without an approved drainage plan, or modifying an installed system without Director sign-off, is a Class A violation of Chapter 8 under § 8-22 and blocks or voids the building permit.

Frequently Asked Questions

Can a rain barrel satisfy Montgomery County's drainage requirement?
Yes, if it uses slow release or a controlled pump discharge and the whole system is designed to handle 1.5 inches of rain in 24 hours, per County Code § 8-29B(b)-(c).
Does this rule apply to every home?
No. It applies only to detached one- or two-family homes on recorded lots under 15,000 square feet, or additions that add more than 400 square feet of lot coverage.

Sources & Official References

Other rules in Montgomery County

All Montgomery County rules

Compare Montgomery County to another location·View the Maryland landscaping rules overview

Get notified when Rainwater Harvesting in Montgomery County, MD changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Rainwater Harvesting in Cities Across Montgomery County