Solano County Code Chapter 31 β Grading, Drainage, Land Leveling, and Erosion Control β is the County's grading and erosion-control ordinance. Most ground-disturbing work in unincorporated Solano County requires a grading permit issued by the Resource Management Department, and that permit incorporates erosion- and sediment-control conditions. Small-fill projects (under 50 cubic yards, under 5,000 sq ft, under 3 ft deep, on slopes flatter than 7:1) are exempt if they meet narrow criteria.
Chapter 31 of the Solano County Code requires a grading permit from Solano County Public Works for any work that involves significant excavation, fill, or land leveling, with a narrow exemption: fill is exempt only when it does not exceed 50 cubic yards on any one site, is less than 5,000 square feet of surface area, less than 3 feet vertical depth, placed on a slope no steeper than 7:1, does not create a slope steeper than 2:1, does not change off-site drainage patterns, will not be used for structural support, and is promptly stabilized or revegetated to prevent erosion. All other grading requires a permit. A grading permit must include an approved erosion-control plan; conditions imposed by the Director of Resource Management can include drainage provisions, revegetation requirements, sediment basins, fiber rolls, silt fencing, hydroseeding, and seasonal limits on disturbed-soil exposure (October 15 β April 15 wet season). Projects disturbing 1 acre or more must also obtain coverage under the State Construction General Permit and submit a SWPPP (see Stormwater). For agricultural land leveling and ranch roads, Chapter 31 still applies but the County coordinates with the Solano Resource Conservation District on best management practices. Permits in Suisun Marsh primary management area carry additional review under the County's Local Protection Program for the Marsh.
Grading without a permit, or failure to install and maintain the required erosion- and sediment-control BMPs, can trigger a Solano County Public Works stop-work order, after-the-fact permitting at higher fees, and required remedial work to restore stable drainage. Discharges of sediment to a creek or to the Suisun Marsh can be referred to the San Francisco Bay or Central Valley Regional Water Quality Control Board for civil penalties under the Clean Water Act, which can reach $10,000 per day per violation.
Fairfield, CA
Residential pools in Fairfield must be enclosed by a barrier between 60 and 72 inches tall with self-closing, self-latching gates that open away from the poo...
Fairfield, CA
Fairfield does not prescribe specific residential fence materials beyond prohibiting barbed wire, razor wire, and electrified fencing in residential zones. C...
Fairfield, CA
Fairfield follows California Civil Code Β§841, the Good Neighbor Fence Law: adjoining owners are presumed to share equally in the cost of building, maintainin...
Fairfield, CA
Fairfield requires a building permit for fences and freestanding walls over 7 feet tall and for retaining walls over 4 feet measured from the bottom of the f...
Fairfield, CA
Fairfield Municipal Code Section 25.30 caps front-yard fences at 42 inches within 15 feet of the front property line and 7 feet beyond that. Street side yard...
Fairfield, CA
Fairfield Municipal Code does not set a hard numeric cap on dogs or cats per household. Animals must be licensed, vaccinated, and kept in conditions that do ...
Side-by-side rule comparisons with other cities in Solano County.
See how Fairfield's erosion control rules stack up against other locations.