Santa Clarita maintains 147 local ordinances across all categories, and 2 of those deal specifically with filming & production. Here is a breakdown of what the city actually requires, what is prohibited, and where Santa Clarita falls on the strict-to-permissive spectrum compared to other cities.

Location Permits

Santa Clarita Municipal Code Section 11.46.020 requires a City film permit before anyone uses public or private property, a public right-of-way, or a residence for commercial motion or still photography. Applicants must carry at least $1,000,000 in liability insurance naming the City as an additional insured, and the City Manager's designee can deny, condition, or cancel a permit for cause.

Key details: Permit trigger: Any commercial filming on public/private property. Stationary shoot threshold: Equipment set up over 5 consecutive minutes. Required insurance: $1,000,000 general liability, City as additional insured. Appeal window: 5 working days to request a hearing. Violation penalty: Misdemeanor plus fee up to 2x permit cost.

Violating Chapter 11.46 or the conditions of an issued film permit is a misdemeanor under Section 11.46.070, and the City may cancel the permit outright. In addition to criminal penalties, the City may assess a penalty fee of up to twice the original permit fee against the violator.

This is one of the stricter rules in Santa Clarita's municipal code. If you are unsure whether your situation complies, it is worth checking with the city before proceeding.

Student Filming

Santa Clarita's film ordinance defines a "student film" as motion or still photography made to satisfy a course or curriculum requirement, and the filmmaker must prove current enrollment. Municipal Code Section 11.46.050 waives both the basic permit-processing fee and the property-use fee for student productions, though student filmmakers still need a Chapter 11.46 permit and any outside-agency fees still apply.

Key details: Fee waived: Basic permit-processing fee for student films. Also waived: Property-use fee under Section 11.46.050(B). Proof required: Documentation of current school enrollment. Permit still required: Chapter 11.46 permit applies regardless of fee waiver. Outside-agency fees: Not covered by the student exemption.

A student production that films without first obtaining the required Chapter 11.46 permit, fee waiver or not, is subject to the same enforcement as any other unpermitted shoot: the City can cancel or deny the permit application, charge the filmmaker with a misdemeanor under Section 11.46.070, and assess a penalty fee of up to twice the ordinary permit fee.

Santa Clarita is more permissive than most cities when it comes to student filming. That said, there are still limits.

The Bottom Line

Santa Clarita's filming & production rules are a mixed bag. Some areas are strict, others are relaxed, and the details matter. The best approach is to check the specific rule that applies to your situation rather than assuming Santa Clarita is broadly strict or permissive.

Keep in mind that Santa Clarita can amend these rules at any council meeting. For the most current version of any rule mentioned here, check the specific ordinance page, where we track updates as they happen.