Cameron County, TX Building Safety: Building Permits (2026)
Key Facts
- Permit required for
- any development in unincorporated Cameron County
- Base fee (≤$10,000 valuation)
- $65.00
- Applications filed at
- Planning and Inspections Division
- Unpermitted work discovery fee
- $250.00
- Temporary Type I permit term
- 4 weeks, renewable to 6 months
- Enforcement
- contempt of Commissioners Court, Tex. Loc. Gov't Code §81.024
Summary
Unincorporated Cameron County requires a building permit for any development, per the county's Flood Damage Prevention and Building Regulations. Applications go through the Planning and Inspections Division to the Floodplain Administrator or Building Official, who verifies flood compliance, subdivision conformity and utility service before construction starts. Base fees run from $65 up through valuation-based formulas, with temporary-structure permits available too.
A Building Permit shall be required to insure conformity with the provisions of this order in connection with any development in the area governed by this order.
Full Breakdown
Article 3, Section C of the county's Flood Damage Prevention and Building Regulations states plainly that 'a Building Permit shall be required to insure conformity with the provisions of this order in connection with any development in the area governed by this order,' and Article 4, Section C sets the process: an application goes to the Floodplain Administrator or Building Official on county forms, available from the Planning and Inspections Division, with scaled plans showing elevations and the location of proposed and existing structures relative to special flood hazard areas.
The applicant must document sewer or septic availability under Health and Safety Code Chapter 366, drinking water under Chapter 341, and electric service meeting NFPA 70 standards. If the lot does not meet the county's Subdivision Rules and Regulations, the applicant is directed to hire a professional engineer or registered surveyor to plat the tract before a permit issues. Temporary structures get their own permits: a Type I permit covers uses of four weeks or less not needing plumbing, electrical or mechanical service, running four weeks and renewable up to six months; a Type II permit runs six months and is likewise renewable on payment of fees and reinspection.
00 per thousand above $1,000,000. 00 for a roofed carport or deck. 00 plan review fee applies per unit, and permits can be renewed, refunded within six months if no work has started, or revoked under Article 4, Section F for licensing or code violations.
Violations & Fines
Working without the required permit triggers a $250.00 discovery fee under Article 4, Subsection F.3, which does not excuse the permit requirement or block legal action for the unpermitted work. Article 4, Section K makes any violation of the order's terms contempt of the Cameron County Commissioners Court under Local Government Code Section 81.024, and the County Engineer can sue to stop unlawful construction or bar occupancy of a noncompliant structure.
Frequently Asked Questions
Do I need a permit to build in unincorporated Cameron County?
How much is a Cameron County building permit?
What happens if I build without a permit?
Sources & Official References
Other rules in Cameron County
Texas rules heatmap·Compare Cameron County to another location·View the Texas building safety overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.