Johnson County, IA Building Safety: Building Permits (2026)
Key Facts
- Permitting authority
- Johnson County Zoning Administrator
- Adopted codes
- 2021 IBC and IRC, as amended
- Work-without-permit fee
- equals the permit fee
- Plan review fee threshold
- construction valued over $15,000
- First-offense infraction penalty
- up to $750
Summary
Anyone building, altering, moving, enlarging, repairing or demolishing a building or structure in unincorporated Johnson County needs a building permit from the Zoning Administrator first, under UDO Section 8:1.27(A)(1). The same permit covers excavation, occupancy changes, and electrical, gas, mechanical or plumbing system work, with a short list of minor exemptions.
A. Permit Types and Application of Regulations. The following permit(s) shall be obtained from the Zoning Administrator in writing before starting or proceeding with any of the work described herein: 1. Building Permit. A building permit is required before starting or proceeding with any of the following: The construction, alteration, movement, enlargement, replacement, repair, equipment, or location, of any building or structure, or as otherwise required by Chapter 8:6 of this ordinance. Excavating for any building or structure. The removal or demolition of any building or structure, or part thereof which would require a building permit to construct. Changing the use or occupancy of any building or structure from one classification to another. The erection, installation, enlargement, alteration, repair, removal, conversion, or replacement of any electrical, gas, mechanical, or plumbing system.
Full Breakdown
27(A) of the Unified Development Ordinance requires anyone starting construction, alteration, movement, enlargement, replacement, repair or demolition of a building or structure in unincorporated Johnson County to obtain a building permit from the Zoning Administrator in writing before work begins. The same permit type covers excavation for a building or structure, a change in use or occupancy classification, and the erection, installation, alteration, removal, conversion or replacement of any electrical, gas, mechanical or plumbing system, all cross-referenced to Chapter 8:6, the Johnson County Building Code, which adopts the 2021 International Building and Residential Codes as amended.
2 excuses work such as detached accessory sheds of 200 square feet or less, fences under seven feet, retaining walls under four feet, and finish work like painting or carpeting, but exemption from a permit never excuses the underlying work from complying with the code. A permit is still required even where a structure is being rebuilt after fire, wind, flood or age-related damage. Permit fees are set by resolution of the Board of Supervisors and are based on the Building Official's valuation of the total construction work; projects valued over $15,000 also owe a separate plan review fee before the permit issues.
Anyone who starts work before obtaining the required permit owes a fee equal to the permit fee that would otherwise apply, collected whether or not a permit is ultimately issued, and paying that fee does not excuse compliance with the rest of the code. Building permits and certificates of occupancy remain revocable for as long as the project is out of compliance, and an appeal of a Building Official decision goes to the Board of Appeals for a fee set by the Board of Supervisors.
Violations & Fines
Starting work without the required permit triggers a fee equal to the permit fee that would have applied, on top of any permit eventually issued, under Section 109.4/R108.4. Because Chapter 8:6 sits inside Chapter 8 of the UDO, an uncorrected permit violation can also become a County infraction under Section 8:8.3, punishable by up to $750 for a first offense and $1,000 for a repeat violation, with permits and certificates of occupancy subject to revocation.
Frequently Asked Questions
When do I need a building permit in Johnson County?
What construction is exempt from a building permit?
What if I start construction before getting a permit?
Who sets building permit fees in Johnson County?
Sources & Official References
Other rules in Johnson County
Compare Johnson County to another location·View the Iowa building safety overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.