Pasco County, FL Building Safety: Building Permits (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Covers
Building, electrical, gas, mechanical, plumbing work
Sheds
Permit required regardless of size
Fence exemption
No concrete footers
Grandfather date 1
Sheds <250 sf, pools before 1/1/1995
Grandfather date 2
Work completed before 1/1/1985

Summary

Pasco County requires a permit for virtually any erection, construction, alteration, or repair of a building or its electrical, gas, mechanical, or plumbing systems, plus sheds and outbuildings. Working without a required permit, or buying property with unpermitted work, is a code violation.

City-specific rules exist: Dade City, and New Port Richey have their own building permits rules that differ from Pasco County's county-level regulations. If you live in one of those cities, check the city-specific page instead.

The following activities require a building permit unless exempted in writing by the Building Official: erection, construction, alteration or repair of a building, structure, electrical, gas, mechanical or plumbing system. Permits are required for sheds and similar outbuildings... Permits are not required for fences without concrete footers, soffit and fascia, painting, minor drywall repairs, kitchen remodels that do not involve electrical or plumbing, mailboxes, and the work identified as exempt from permits in section 105.2 of the Florida Building Code.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 94 Update 1 | Land Development Code: Supplement 20).

Full Breakdown

Code of Ordinances Sec. 18-36 sets the county's general permit requirement: erection, construction, alteration, or repair of a building, structure, or its electrical, gas, mechanical, or plumbing system requires a building permit unless the building official exempts it in writing. Sheds and similar outbuildings need permits too. 2 of the Florida Building Code. Anyone who buys land or a structure with a pre-existing unpermitted violation must obtain an after-the-fact permit or restore the property once warned, though the code carves out two grandfather dates: sheds under 250 square feet and above-ground pools erected before January 1, 1995 don't need after-the-fact permits, and any work completed before January 1, 1985 is exempt entirely.

Structures on bona fide agricultural (greenbelted) property are exempt from the Florida Building Code itself under Sec. 18-37, but still need a permit from the central permitting manager to confirm Land Development Code compliance. S. Sec. 103, and corporate property owners can't claim the owner-builder exemption.

Violations & Fines

Commencing work requiring a permit without one, contracting for or assisting such work, or failing to obtain an after-the-fact permit once warned are each separate chapter 18 violations under Sec. 18-36. Enforcement runs through Sec. 1-11's civil citation process, capped at $500 per violation plus costs or up to 60 days in county jail, and each day the violation continues counts as a new offense; contractors also risk being barred from new permits under Sec. 18-41 if they have unresolved violations or unpaid judgments.

Frequently Asked Questions

Does Pasco County require a permit for a backyard shed?
Yes. Sec. 18-36 specifically lists sheds and similar outbuildings as requiring a building permit, with no size exemption for new construction, though sheds under 250 square feet built before January 1, 1995 don't need an after-the-fact permit if never previously permitted.
Can I install a fence in Pasco County without a permit?
Only if it has no concrete footers. Sec. 18-36 exempts fences without concrete footers from the permit requirement, along with soffit and fascia work, painting, minor drywall repairs not touching electrical or plumbing, and mailboxes.
What happens if I buy a Pasco County property with unpermitted work?
Sec. 18-36 makes the new owner responsible for obtaining an after-the-fact permit or restoring the structure once warned about the existing violation, unless the work falls under the pre-1985 or pre-1995 grandfather exceptions written into the section.

Sources & Official References

Other rules in Pasco County

All Pasco County rules

Florida rules heatmap·Compare Pasco County to another location·View the Florida building safety overview

Get notified when Building Permits in Pasco County, FL changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.