Weber County, UT Building Safety: Building Permits (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Governing section
Weber County Code § 12-3-1
Adopted code
State-amended International Building Codes
Base fee, up to $2,000
$69.25
Fee at $1,000,000+
$5,608.75 plus $3.65 per $1,000 over
No-permit penalty
Extra fee equal to permit fee
Code violation penalty
Class B misdemeanor

Summary

Weber County requires a permit before erecting, enlarging, altering, repairing, moving or demolishing any building or structure under Code § 12-3-1, which adopts the state's International Building Codes. Fees run on a valuation-based schedule, and building without a permit draws an added fee equal to the permit itself.

These county ordinances apply to unincorporated areas of Weber County. Incorporated cities within the county may have their own rules that take precedence over county-level regulations.

The specific editions of a nationally recognized code authority as adopted and amended by the State of Utah and published in Title 15A of the Utah Code, Chapter 2, Sections 103 and 104, are hereby adopted as the Building Code of Weber County, Utah, for regulating the erection, construction, enlargement, alteration, repair, moving, removal, demolition, conversion, occupancy, equipment, use, height, area and maintenance of all buildings or structures in the county, providing for issuance of permits and collection of the corresponding permit fees, and by this reference are made a part of this chapter to the same extent and effect as though said codes were set forth herein in full.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: ?).

Full Breakdown

Section 12-3-1, International Building Codes Adopted, adopts 'the specific editions of a nationally recognized code authority as adopted and amended by the State of Utah and published in Title 15A of the Utah Code' as the Building Code of Weber County, covering 'the erection, construction, enlargement, alteration, repair, moving, removal, demolition, conversion, occupancy, equipment, use, height, area and maintenance of all buildings or structures in the county,' and it is this adoption that creates the permit requirement and fee structure for construction work. Section 12-3-2 makes it unlawful to do any of that work, or cause it to be done, in violation of the adopted codes, and calls a violation a class B misdemeanor unless another penalty applies.

The permit fee itself follows the valuation table in Section 12-3-6: $69.25 for work valued up to $2,000, rising in tiers to $5,608.75 for the first $1,000,000 of valuation plus $3.65 for every additional $1,000 above that. Section 12-3-7 has the building official use the International Code Council's published valuation data to set a project's total valuation, except finished basements, which are valued at half the square-foot cost table. Section 12-3-8 adds inspection-specific charges on top of the permit fee: $150 for electrical work, $100 each for plumbing and mechanical, and a one percent state surcharge.

Anyone who starts work requiring a permit before actually obtaining it owes an additional fee equal to the full permit fee once the permit is issued, on top of the permit fee itself, under Section 12-3-8, item 6. Utility companies are also barred from connecting service to a structure or equipment requiring a permit until the building official approves it, under Section 12-3-5.

Violations & Fines

Building, enlarging, altering, repairing, moving or demolishing a structure without the required permit, or in violation of the adopted codes, is a class B misdemeanor under Section 12-3-2 unless a different penalty applies. Starting work before the permit issues adds a fee equal to the full building permit fee under Section 12-3-8, and utility companies must refuse hookups to unpermitted work under Section 12-3-5.

Frequently Asked Questions

What triggers a building permit requirement in Weber County?
Section 12-3-1 adopts the state's International Building Codes for 'the erection, construction, enlargement, alteration, repair, moving, removal, demolition, conversion, occupancy, equipment, use, height, area and maintenance of all buildings or structures in the county,' so any of that work on a building or structure requires a permit under the adopted codes.
How is the building permit fee calculated in Weber County?
Section 12-3-6 uses a valuation-based sliding scale: $69.25 covers work valued up to $2,000, and fees climb through several brackets to $5,608.75 for the first $1,000,000 of valuation plus $3.65 for each additional $1,000. Section 12-3-7 has the building official calculate the valuation from the International Code Council's published data.
What happens if I build without a permit in Weber County?
Section 12-3-8 adds a fee equal to the full permit fee whenever work requiring a permit begins before the permit is obtained, on top of the permit fee itself, and Section 12-3-2 makes unpermitted or non-code-compliant construction a class B misdemeanor.
Can a utility company connect power to a building without a permit in Weber County?
No. Section 12-3-5 bars any utility company from providing service to a structure, or to equipment or wiring requiring a permit, until the building official approves it, and lets the official order service terminated where the use is unauthorized.

Sources & Official References

Other rules in Weber County

All Weber County rules

Compare Weber County to another location·View the Utah building safety overview

Get notified when Building Permits in Weber County, UT changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.