Placer County, CA Building Safety: Building Permits (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified August 2026

Key Facts

Shed exemption
Up to 120 sq ft, 12 ft tall
Fence exemption
Wire fences to 12 ft, others to 7 ft
Repair exemption
Under $2,500 in any 12-month period
Permit expiration
2 years from issuance
Early subdivision permits
Capped at 20% of lots (up to 50%)
Application abandonment
Expires 1 year after filing if inactive

Summary

Placer County Code § 15.04.070 requires a building permit for most construction in the unincorporated county but exempts specific small projects: detached sheds and playhouses up to 120 square feet and 12 feet tall, wire fences up to 12 feet, and other fences up to 7 feet. Repairs under $2,500 in any 12-month period that do not touch electrical, plumbing, or mechanical systems are also exempt.

City-specific rules exist: Roseville has its own building permits rules that differ from Placer County's county-level regulations. If you live in Roseville, check the city-specific page instead.

Item 1, to be replaced as follows: One-story detached accessory structures used as tool and storage sheds, playhouses and similar uses, provided the floor area does not exceed 120 square feet, when meeting Placer County Planning Services/zoning setback requirements, and the height does not exceed 12 feet measured in accordance with the Placer County Zoning Ordinance. A permit is required for any electrical, mechanical or plumbing work installed. Item 2, to be replaced as follows: Wire fences not over 12 feet in height for residential and agricultural uses and other fences not over 7 feet in height.

Full Breakdown

070 amends CBC Section 105 to define when unincorporated Placer County requires a building permit and where it does not. Detached accessory buildings such as tool sheds and playhouses are exempt from a building permit if they stay under 120 square feet and 12 feet tall and meet planning services setback requirements, though a permit is still required for any electrical, mechanical, or plumbing work installed in them. Wire fences up to 12 feet for residential or agricultural use, and other fences up to 7 feet, do not need a permit.

Free-standing membrane structures under 200 square feet, properly anchored and set back per Chapter 17, are exempt as long as they carry no electrical, plumbing, or mechanical systems; in the Tahoe basin those structures must also avoid creating TRPA-regulated land coverage. Agricultural buildings on 10 or more acres zoned F, RF, FOR, AE, or RA are exempt from a full building permit but must still obtain a setback verification permit and comply with the county's plumbing, mechanical, and electrical codes. Radio and TV antennas up to 45 feet, and dish antennas up to 15 feet, are also exempt.

Within a recorded subdivision, no building permit issues until the subdivider's required improvements are accepted by the board of supervisors, except that early permits with a non-occupancy restriction may issue once the final map is recorded, pad grading is done, and roads and utilities to the lot are complete; early permits are capped at 20 percent of lots in a subdivision phase (up to 50 percent with CDRA approval) and four permits for subdivisions under 20 lots. Every issued permit expires two years after issuance unless extended, and an unstarted or unfinished application abandoned for a year is deemed abandoned and expired.

Violations & Fines

Building without a required permit, or occupying a structure built under an early or model-home permit before subdivision improvements are accepted, is a code violation. Under § 15.04.140, violations are misdemeanors, though a first offense may be an infraction under County Code § 1.24.010, with each day of continued violation a separate offense punishable by up to six months in jail, the maximum fine state law allows, or both, plus recordation of the violation against the property.

Frequently Asked Questions

Do I need a permit for a backyard shed in Placer County?
Not if it is a one-story detached shed or playhouse under 120 square feet and 12 feet tall that meets zoning setbacks. You do still need a permit for any electrical, mechanical, or plumbing work installed inside it, under § 15.04.070.
How long is a Placer County building permit valid?
Two years from issuance under the amended Section 105.5. The chief building official can grant up to two one-year extensions for justifiable cause, and an expired permit with no prior extension can get a one-time retroactive extension if it has not lapsed more than a year.
Can I get a building permit before subdivision improvements are finished?
Yes, in limited cases. Section 15.04.070 (105.1.4) allows early, non-occupancy permits once the final map is recorded, pad grading is complete, and roads and utilities reach the lot, capped at 20 percent of lots per phase (up to 50 percent with CDRA approval).

Sources & Official References

Other rules in Placer County

All Placer County rules

California rules heatmap·Compare Placer County to another location·View the California building safety overview

Get notified when Building Permits in Placer County, CA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Building Permits in Cities Across Placer County