Butte County, CA Building Safety: Electrical Permits (2026)
Key Facts
- Adopted code
- 2025 California Electrical Code, Part 3
- Adopting section
- § 26-1
- Permit expiration
- 1 year from issuance (§ 26-3.1(c))
- Renewal window
- 30 days after expiration
- Local exemption
- Agricultural water pumps need no permit
- General penalty
- Up to $1,000 fine / 6 months jail
Summary
Butte County adopts Part 3 of Title 24, the California Electrical Code, by reference as its electrical code under Section 26-1. Electrical permits run on the same one-year expiration and renewal clock as building permits under Section 26-3.1(c), and the Building Official amended the code to exempt agricultural water pumps used solely for agricultural purposes from needing an electrical permit at all.
Part 3 California Electrical Code. ... The 2025 California Building Standards Code parts and appendices listed above are hereby declared to be the building code for Butte County and shall apply to and govern all building construction in the unincorporated areas of the county... "Electrical", "4" is added as follows: No permits shall be required for the installation, alteration or repair of agricultural water pumps used solely for agricultural purposes.
Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 61).
Full Breakdown
Butte County no longer keeps a standalone electrical code chapter; the editor's note to Chapter 27 (Electricity) records that the former chapter "was repealed and replaced by Ord. No. 3973, § 8, 12-11-07," with its substance folded into Chapter 26 (Buildings). Section 26-1 adopts the 2025 edition of the California Building Standards Code by reference, and its table lists "Part 3, California Electrical Code" alongside the Building, Residential, Mechanical, and Plumbing codes as part of that adoption, applying "to and govern all building construction in the unincorporated areas of the county."
Section 26-3.1(c) then ties electrical permits to the same administrative rules the county wrote for building permits: "The following provision shall apply to permits under the 2025 California Residential Code, 2025 California Electrical Code, 2025 California Mechanical Code, and 2025 California Plumbing Code: The rules concerning time limitation of application, expiration, transferability, occupancy, and work exempt from a permit shall be as specified in subsection (a) above." That cross-reference means an electrical permit application expires one year after filing if the permit is not issued (Section 105.3.2), an issued permit expires one year from issuance with a 30-day window to renew before a new application and fees are required (Section 105.5), and a permit can be transferred to a new owner or contractor (Section 105.8). Section 26-3.1(a) also adds a Butte-specific exemption directly to the "Electrical" work-exempt list: "No permits shall be required for the installation, alteration or repair of agricultural water pumps used solely for agricultural purposes."
Violations & Fines
Electrical work performed without a permit, or a permit allowed to expire without renewal, is a code violation the Building Official can pursue as a Building Standards Code matter. Chapter 41 (Code Enforcement Policies and Procedures) governs abatement. Where the Code does not set a specific penalty, Section 1-7 applies a general fine of up to one thousand dollars, up to six months in jail, or both, with each day of a continuing violation charged as a separate offense.
Frequently Asked Questions
Does every electrical job in Butte County need a permit?
How long is a Butte County electrical permit valid?
Does Butte County have its own electrical code?
Sources & Official References
Other rules in Butte County