Jefferson County, MO Building Safety: Electrical Permits (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified August 2026

Key Facts

Governing code
NEC 2014 + County Electrical Code 2017
License term
3 years, Section 500.140
Panel permit fee (residential)
$115-$136 by amperage
Late-start penalty
100% surcharge, Section 500.300.C
Max criminal penalty
$1,000 fine or 1 year jail

Summary

Jefferson County requires a county Electrical License before any contractor wires, installs or alters electrical service in the unincorporated area, and a building permit before work starts. The Code Official issues licenses under Section 500.140 for a three-year term to applicants who pass a master electrician exam, and the 2014 National Electrical Code applies as locally amended under Article IX plus the county's own Article X Electrical Code 2017.

These county ordinances apply to unincorporated areas of Jefferson County. Incorporated cities within the county may have their own rules that take precedence over county-level regulations.

The Code Official shall be and is hereby authorized to grant a license to any person, firm or corporation (hereinafter "contractor") found to be qualified to engage in the work of installing, erecting, or altering any electrical service or equipment and making service corrections on material, wiring, fixtures, machinery, and other apparatus to be used, or in use for the generation and utilization of electricity... The license shall be issued in the name of the contractor and a responsible person shall be listed. The license shall be valid for a period of three (3) years. ... No contractor shall perform electrical work or hold itself out in any advertising medium or publication as being available to perform such work unless licensed pursuant to this Section.

Full Breakdown

010 adopts the National Electrical Code 2014 Edition together with the Jefferson County Electrical Code 2017 as the governing standards for wiring, service equipment and grounding countywide. 140 sets the licensing path: an applicant must be at least twenty-one years old, work for a single employer in the contracting business, and pass a master electrician exam scoring seventy percent (70%) or better within the past six years, backed by either a college degree plus one year's field experience, six years of hands-on wiring experience, or a two-year trade-school diploma plus three years of practical work.

D bars anyone from performing or advertising electrical work without the license. 190 if they occupy the home, personally perform all the work, keep only one permit open at a time, and pass a written homeowner exam scored at least seventy-five percent (75%); the homeowner permit runs for one year. 00. 00. 8(A) for outlets in bathrooms, garages, kitchens, crawl spaces, unfinished basements, outdoor locations, and near sinks, tubs and showers.

Violations & Fines

Starting electrical work before the permit issues costs the contractor an extra penalty equal to one hundred percent (100%) of the usual permit fee, on top of the fee itself, under Section 500.300.C, and the Code Official can disconnect utility service. Anyone who violates the Building Code, including work done without or contrary to a permit, commits a misdemeanor under Section 500.300.E punishable by a fine up to $1,000.00, up to one year in jail, or both, with each day of continued violation counted as a separate offense.

Frequently Asked Questions

Does Jefferson County require a permit for electrical work?
Yes. Section 500.010 adopts the National Electrical Code 2014 and the county's own Electrical Code 2017, and Section 500.140 bars any contractor from performing electrical work without a county Electrical License, issued by the Code Official for a three-year term to applicants who pass a master electrician exam. Starting before the permit issues adds a 100% fee surcharge under Section 500.300.C.
Can a homeowner wire their own house in Jefferson County?
Yes, under Section 500.190, if it is a detached single-family home the owner occupies, the owner personally performs all the work, only one permit stays open at a time, and the owner passes a written homeowner exam scored at least 75%. The homeowner permit is valid for one year and does not waive any Building Code material or design requirement.
How much does an electrical permit cost in Jefferson County?
Fees are set by panel size under Section 500.250: a residential panel up to 200 amps is $115.00, rising to $136.00 above 600 amps, with meter-base fees of $53.00 to $65.00 and miscellaneous residential electrical work at $125.00. Commercial panel fees range from $165.00 to $218.00 depending on amperage.

Sources & Official References

Other rules in Jefferson County

All Jefferson County rules

Compare Jefferson County to another location·View the Missouri building safety overview

Get notified when Electrical Permits in Jefferson County, MO changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.