Prince George's County, MD Building Safety: Electrical Permits (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified August 2026

Key Facts

Adopted code
2020 NEC, NFPA edition
Enforcing agency
Dept. of Permitting, Inspections & Enforcement
Device-swap exemption
Up to 5 devices, once per structure
Permit expires
6 months with no work or inspection
Unpermitted work fee
$180 residential / $300 commercial + 10%
Reinspection fee
$66 plus 10% technology fee

Summary

Prince George's County adopts the 2020 National Electrical Code by reference and requires a permit before any electrical work begins. The permit must be posted at the job site, and the work must be supervised by a licensed Master Electrician, Master Electrician Limited, or licensed HVAC contractor.

These county ordinances apply to unincorporated areas of Prince George's County. Incorporated cities within the county may have their own rules that take precedence over county-level regulations.

No person shall perform electrical work until a permit has been obtained and a copy has been posted at the job site or presented to the owner or occupant. The work must be done under the personal and technical supervision of a licensed Master Electrician or Master Electrician, Limited, or a licensed Refrigeration, Air Conditioning and/or Heating Contractor. No permit shall be required for in-kind/in-place replacement of existing receptacles, switches or lighting fixtures not exceeding a combination of five (5) devices per structure.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 2026 Update 2).

Full Breakdown

Section 9-101 adopts the National Electrical Code, 2020 Edition, published by the National Fire Protection Association, "with the same force and effect as though set out in full herein as the Official Electrical Code of Prince George's County," subject to the local amendments in Subtitle 9. " Section 9-113 requires written applications on the Department of Permitting, Inspections and Enforcement's prescribed form, accompanied by plans, specifications, and the required fee, and limits issuance to a duly licensed Master Electrician, Master Electrician Limited, or licensed HVAC contractor except for the homeowner exception in Section 9-117.

That exception lets an owner-occupant of a single-family dwelling pull a permit and do limited work personally, but Section 9-117(c) bars homeowner permits for new service installations, service heavy-ups, panel changes, panel or meter relocations, service drop or lateral relocations, and subpanel installations. Section 9-118 sets every permit to expire if work is not started within six months of issuance or if no inspection occurs within a six-month period, and work must otherwise track the permit's technical supervision requirement. Section 9-121 leaves permit and inspection fees to a Council-adopted resolution following a public hearing.

Violations & Fines

The Director revokes an electrical permit without refunding the fee immediately upon discovering "any false statement or misrepresentation of fact" in the application or plans, per Section 9-120. Starting work before obtaining a required permit triggers a special investigation under Section 9-122(b): a $180 investigation fee plus a 10% technology fee for residential work, or $300 plus the technology fee for commercial work, on top of the regular filing and permit fees. Concealing or partially completing work without the required inspection triggers the same special-investigation fee. A missed inspection appointment for incomplete work draws a $66 reinspection fee plus the 10% technology fee under Section 9-122(c).

Frequently Asked Questions

Do I need a permit to swap a light fixture in Prince George's County?
Not always. Section 9-112 exempts in-kind, in-place replacement of receptacles, switches, or lighting fixtures totaling five devices or fewer per structure, but a note in the section limits that exemption to one use for the life of the building. Anything beyond that, or a new circuit, needs a permit.
Can I pull my own electrical permit as a homeowner?
Yes, if you occupy or intend to occupy a single-family dwelling for at least a year, under Section 9-117. You must apply for the permit, pay the fee, follow the submitted work description, and request all required inspections yourself. Section 9-117(c) still blocks homeowner permits for new service, panel changes, or subpanel installs.
What happens if I start electrical work without a permit?
Section 9-122(b) requires a special investigation before you can even apply for the permit, adding a $180 fee plus a 10% technology surcharge for residential work or $300 plus the surcharge for commercial work. That is on top of the standard filing and permit fees you still owe.
Who supervises electrical work under a Prince George's County permit?
Section 9-112 requires the work to proceed under the personal and technical supervision of a licensed Master Electrician, a Master Electrician Limited, or a licensed Refrigeration, Air Conditioning and/or Heating Contractor, except where the homeowner exception in Section 9-117 applies.

Sources & Official References

Other rules in Prince George's County

All Prince George's County rules

Compare Prince George's County to another location·View the Maryland building safety overview

Get notified when Electrical Permits in Prince George's County, MD changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.