Washoe County, NV Building Safety: Electrical Permits (2026)
Key Facts
- Adopted code
- 2023 National Electrical Code, WCC § 100.100.10(11)
- Permit issuance fee
- $45.00 flat (Appendix A, Table 8)
- New single-family wiring fee
- $0.04 per square foot
- Multifamily wiring fee
- $0.03 per square foot
- Unpermitted work penalty
- 2x to 4x fee, up to $4,000 residential
- Enforcing agency
- Washoe County Building Program
Summary
Washoe County requires a permit before anyone installs, alters, or replaces an electrical system, per Washoe County Code § 100.105.1. The Building Program inspects that work against the 2023 National Electrical Code, adopted at § 100.100.10(11). Permit issuance costs $45, plus per-square-foot fees for new wiring under Appendix A, Table 8, and unpermitted work is a misdemeanor with a doubled inspection fee.
100.105.1 - Required. Any owner or authorized agent who intends to construct, enlarge, alter, repair, move, demolish, or change the occupancy of a building or structure, or to erect, install, enlarge, alter, repair, remove, convert or replace any electrical, gas, mechanical or plumbing system, the installation of which is regulated by this code, or to cause any such work to be done, shall first make application to the Building Program and obtain the required permit. 100.100.10 - Adopted codes. The following recognized codes are hereby adopted by Washoe County together with the supplements, listed changes, additions and deletions as noted: ... 11.2023 National Electrical Code ("NEC First Print").
Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 20 Update 2).
Full Breakdown
Section 100.105.1 of the Washoe County Code requires anyone who intends to erect, install, enlarge, alter, repair, remove, convert or replace an electrical system to first apply to the Building Program and obtain a permit before starting work. The county adopted the 2023 National Electrical Code as item 11 of § 100.100.10's list of adopted codes, most recently amended by Ordinance No. 1736 effective July 1, 2025. A handful of minor jobs are exempt under § 100.105.2: replacing lamps, connecting approved portable equipment to existing receptacles, reinstalling attachment plug receptacles, swapping a branch circuit overcurrent device of the same capacity in the same location, repairing switches or control devices, replacing electrodes or transformers of the same size for signs, and replacing light fixtures in single-family homes and accessory structures. Listed temporary decorative or construction lighting, carnival wiring, and lab experimental wiring are also exempt. Everything else needs a permit and inspection.
Fees run from Appendix A, Table 8: $45 to issue any electrical permit, plus a system fee of $0.04 per square foot for new single- and two-family wiring, $0.03 per square foot for new multifamily wiring, $15 for a private in-ground residential pool's electrical work, and $15 for a temporary power pole. Applicants who need work done before a permit issues, such as an emergency repair, must submit the application by the next business day under § 100.105.1.1, and contractors who regularly perform repeat alteration work can apply for an annual permit instead of filing one application per job under § 100.105.1.2.
Violations & Fines
Performing electrical work without the required permit is an unlawful act under § 100.113.1 and is prosecuted as a misdemeanor, with each day of continued violation charged as a separate offense under § 100.113.3. Anyone who starts work before a permit issues owes an investigative fee equal to double the permit fee under § 100.113.3.1, which the Building Program can raise to four times the fee for a licensed contractor, capped at $4,000 for residential work. The Division Director can also issue a stop work order under § 100.114.1.
Frequently Asked Questions
Do I need a permit for minor electrical repairs in Washoe County?
What electrical code does Washoe County enforce?
How much does a new home electrical permit cost in Washoe County?
What happens if I do electrical work without a permit in Washoe County?
Sources & Official References
Other rules in Washoe County
Compare Washoe County to another location·View the Nevada building safety overview