Martin County, FL Building Safety: Electrical Permits (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Adopted code
Florida Building Code, per Sec. 21.1
Permit review
Building Official examines plans before issuance
Inspections
During work and after completion
Enforcement
Stop-work order or permit revocation

Summary

Martin County requires an active permit before altering electrical, plumbing, gas, or mechanical systems, and the Building Official inspects the work before, during, and after installation.

These county ordinances apply to unincorporated areas of Martin County. Incorporated cities within the county may have their own rules that take precedence over county-level regulations.

Before issuing a permit, the Building Official may examine or cause to be examined any building, electrical, gas, mechanical, or plumbing systems for which an application has been received for a permit to enlarge, alter, repair, move, demolish, install, or change the occupancy. He shall inspected all buildings, structures, electrical, gas, mechanical, and plumbing systems, from time to time, during and upon completion of work for which a permit was issued.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 62 | Land Development Regulations: Supplement 62).

Full Breakdown

Sec. 21.1 makes the state-adopted Florida Building Code the county's construction code, and Sec. 21.9 puts electrical work through the same permit pipeline as plumbing, gas, and mechanical work: before a permit is issued for any job that enlarges, alters, repairs, moves, demolishes, or installs an electrical system, the Building Official may examine the application, then inspects the work again as it proceeds and once more after it's finished. Every inspection and every code violation found gets logged. Under Sec. 21.5, the Building Official can revoke a permit issued on inaccurate information or stop work outright on a job that's unsafe or out of compliance.

Violations & Fines

Skipping the permit or ignoring a stop-work order lets the Building Official halt the job on site and revoke or deny the permit until the work is corrected.

Frequently Asked Questions

Does Martin County require a permit for electrical work?
Yes. Sec. 21.9 has the Building Official examine electrical systems before issuing a permit, then inspect the work as it proceeds and again after completion.
What happens if I do electrical work without a permit?
The Building Official can issue a stop-work order under Sec. 21.5 and deny or revoke the permit until the installation is corrected.

Sources & Official References

Other rules in Martin County

All Martin County rules

Florida rules heatmap·Compare Martin County to another location·View the Florida building safety overview

Get notified when Electrical Permits in Martin County, FL changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.