Contra Costa County, CA Building Safety: Building Inspections (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Inspection stages
Initial, Rough, Final
Supervised development
Full-time engineer inspection required
Engineer departure
Must report within 48 hours
Completion proof
Certificate issued under § 716-6.018
Extra inspections
Building official may add beyond 3 stages

Summary

Grading work under a Contra Costa County permit is checked at three defined stages under Section 716-6.006: initial, once the site is cleared and prepped before fill goes in; rough, once elevations and drainage devices are graded; and final, once all drainage facilities are installed and slope planting is established. The county building official approves or rejects each stage before work proceeds.

These county ordinances apply to unincorporated areas of Contra Costa County. Incorporated cities within the county may have their own rules that take precedence over county-level regulations.

(a)The county building official, upon notification from the permittee or his agent, shall inspect the work at the following stages of the work and shall either approve the portion then completed or shall notify the permittee or his agent wherein it fails to comply with the requirements of this division:(1)Initial. When the site has been cleared of vegetation and unapproved fill and has been scarified, benched or otherwise prepared and before any fill is placed;(2)Rough. When rough grading has been completed and approximate final elevations have been established; drainage terraces, swales and other drainage devices graded ready for paving; and berms installed at the top of slopes;(3)Final. When work has been completed, all drainage devices, systems and facilities installed and slope planting established.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Ordinance Code: Supplement 103).

Full Breakdown

Chapter 716-6, Control of Work, governs how the county building official inspects grading permits issued under Division 716. 006(a) requires the permittee to notify the building official at each of three called stages so the county can either approve the work completed to that point or explain in writing where it falls short: the initial stage, once the site is cleared of vegetation and unapproved fill and has been scarified or benched but before any fill is placed; the rough stage, once rough grading is done, approximate final elevations are set, drainage terraces and swales are graded ready for paving, and berms are installed at the top of slopes; and the final stage, once all drainage devices and facilities are installed and slope planting has taken.

Subsection (b) also lets the building official make additional inspections beyond those three stages, and require reports from a soil engineer or engineering geologist, whenever needed to confirm compliance. 006 stage requirements, with compaction data, drainage inspection reports, and geological findings all funneled to the county building official. 018 only once work under the permit is satisfactorily finished.

Violations & Fines

If a project's soil or civil engineer finds work out of conformance with the approved plans, Section 716-6.010 requires immediate written notice to both the permittee and the county building official describing the nonconformity and the fix required. An engineer who quits or is removed before the work is done must report the job's status to the building official in writing within forty-eight hours under Section 716-6.012, and no certificate of completion issues under Section 716-6.018 until the outstanding inspection stages are satisfied.

Frequently Asked Questions

What are the three inspection stages for a Contra Costa County grading permit?
Section 716-6.006(a) sets Initial (site cleared and prepped, before fill is placed), Rough (grading substantially done, elevations set, drainage devices graded), and Final (drainage facilities installed and slope planting established). The county building official must approve each stage before work moves to the next.
Who inspects a large or hazardous grading job instead of the county?
Section 716-6.008 requires 'supervised development work,' meaning fill meant to support structures or grading the building official flags as unusually hazardous, to be inspected full-time by a project soil or civil engineer, who reports compaction data and drainage findings to the county building official.
How do I prove my grading work is finished?
The county building official issues a certificate of completion under Section 716-6.018 only after the work under the approved permit is satisfactorily finished and has passed the Initial, Rough, and Final inspections required by Section 716-6.006.

Sources & Official References

Other rules in Contra Costa County

All Contra Costa County rules

California rules heatmap·Compare Contra Costa County to another location·View the California building safety overview

Get notified when Building Inspections in Contra Costa County, CA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Building Inspections in Cities Across Contra Costa County