Santa Barbara County, CA Building Safety: Building Inspections (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified August 2026

Key Facts

Governing chapter
County Code Ch. 14 (Grading)
Required inspection stages
8, pre-construction through final
Notice before inspection
24 hours to planning and development
Rainy-season inspections
2/month, Nov. 1-Apr. 15, 1+ acre sites
Unpermitted work fee
Double permit fee (Sec. 14-16(c))

Summary

Grading and excavation work permitted under Santa Barbara County Code Chapter 14 goes through eight numbered inspection stages, from pre-construction through final, run by the planning and development department's building official.

City-specific rules exist: Santa Maria has its own building inspections rules that differ from Santa Barbara County's county-level regulations. If you live in Santa Maria, check the city-specific page instead.

Inspections for a grading permit shall be made as provided herein and work shall not continue until approval to proceed has been granted following each required inspection. The permittee shall be responsible for notifying the planning and development department at least twenty-four hours prior to the time when the inspection is to be made. Required inspections: (1)Pre-Construction Inspection...(2)Toe/bench/keyway Inspection...(3)Excavation Inspection...(4)Fill Inspection...(5)Drainage Device Inspection...(6)Rough Grade Inspection...(7)Final Inspection.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 44 Update 1).

Full Breakdown

Section 14-18(a) makes all work under a grading permit subject to periodic or continuous inspection by the building and safety division, with continuous supervision by a civil engineer, geotechnical engineer, or engineering geologist required where the building official finds it necessary for public safety. Section 14-18(e) lists the required inspections: a pre-construction inspection before grading or brushing starts; a toe/bench/keyway inspection before fill is placed; an excavation inspection before vertical depth exceeds ten feet; a fill inspection before vertical height exceeds ten feet; a drainage device inspection before concrete or pipe is buried; a rough grade inspection when rough grading is complete; and a final inspection once all drainage structures, protective devices, and planting are complete and the as-graded plan is accepted.

The permittee must notify the planning and development department at least twenty-four hours before each required inspection, and work cannot continue until the building official approves that stage. During the rainy season, defined as November 1 through April 15, Section 14-18(e) requires a minimum of two county inspections per month on active projects disturbing one acre or more. Section 14-18(b) requires an inspection record card posted on site for the building official's entries, and Section 14-18(l) requires the final inspection be made by a planning and development department employee.

Section 14-21 lets the building official order any covered or concealed work exposed for examination at the property's expense if it was not inspected before being covered.

Violations & Fines

Section 14-14 allows the building official to revoke or suspend a grading permit for failure to comply with Chapter 14 or the permit's terms, after written notice to the owner or permittee stating the reasons. Section 14-16(c) imposes a double permit fee where grading or land-clearing work begins without a permit, and Section 14-20 makes it unlawful to continue or commence work in violation of a stop work order.

Frequently Asked Questions

How many inspections does a Santa Barbara County grading permit require?
Section 14-18(e) lists eight required stages: pre-construction, toe/bench/keyway, excavation, fill, drainage device, rough grade, final, and any other inspections the director requires to confirm compliance with the chapter and NPDES stormwater permit.
Who inspects grading work in unincorporated Santa Barbara County?
County inspectors from the planning and development department's building and safety division conduct the inspections, and the building official may also require continuous supervision by a licensed civil engineer, geotechnical engineer, or engineering geologist under Section 14-18(a).
What happens if grading work starts without a permit?
Under Section 14-16(c), a double permit fee is assessed for violations where grading or land-clearing work began without the required permit, in addition to any stop work order the building official can issue under Section 14-20.

Sources & Official References

Other rules in Santa Barbara County

All Santa Barbara County rules

California rules heatmap·Compare Santa Barbara County to another location·View the California building safety overview

Get notified when Building Inspections in Santa Barbara County, CA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Building Inspections in Cities Across Santa Barbara County