Pitt County, NC Building Safety: Building Inspections (2026)
Key Facts
- Required inspection stages
- 6 (footing to final)
- Work-stop rule
- No work past a stage without sign-off
- Re-inspection fee
- Adopted fee schedule rate
- Entry authority
- With proper credentials, per statute
- Occupancy gate
- Certificate of occupancy required
Summary
Pitt County requires at least six staged inspections during construction, footing, pre-underslab, foundation, frame and rough-in, insulation, and final, and bars work from proceeding past each stage until an Inspector signs off on the job-site building card.
A. Footing Inspection. To be made after the trenches are excavated, all grade stakes are installed, all reinforcing steel and supports are in place and appropriately tied, all necessary forms are in place and braced and before any concrete is placed... D. Frame Inspection and Rough In. To be made after the roof, all framing, fire-blocking, and bracing is in place and all pipes, chimneys, vents, electrical panel, electrical wire, receptacle boxes, fixture boxes, plumbing pipes, heat and air-conditioning vents and all other items in place which will be covered by insulation or interior finishes... F. Final Inspection. To be made after the building or structure is completed and ready for occupancy.
Full Breakdown
Section 19 of the Building Codes Enforcement Ordinance lists the required inspections: a footing inspection after trenches, grade stakes, reinforcing steel and forms are in place but before concrete is poured; a pre-underslab inspection after electrical, plumbing and HVAC facilities, crushed stone, vapor barrier and reinforcing steel are installed but before concrete; a foundation and pre-sub-floor inspection after foundation supports and floor joists are installed; a frame inspection and rough-in after the roof, framing, fire-blocking and bracing are up and all pipes, electrical panel and wire, receptacle and fixture boxes, and HVAC vents are in place but before they are covered; an insulation inspection after rough-ins are complete and insulation installed but before finishes are applied; and a final inspection after the building is complete and ready for occupancy.
It is the permit holder's or agent's responsibility to give timely notice and schedule each inspection. Section 20 bars work from proceeding beyond any inspection point until the Inspections Department gives written approval by signing the relevant section of the building card posted on the job site, and separately requires notice before reinforcing steel or structural framework is covered, and before plaster is applied over lathing installed for fire protection. Section 18 gives authorized Inspections Department personnel the right to enter any premises within their jurisdiction for inspection, to the extent state law allows, upon presenting proper credentials, and Section 21 lets the department require independent tests or test reports at the owner's expense where necessary to verify code compliance.
Section 23 bars occupancy of a new building, or a change in occupancy or use, until the department issues a certificate of occupancy, though a temporary certificate may be issued for specific portions found safe before the whole project is complete.
Violations & Fines
Additional inspection trips made necessary by a contractor's or owner's failure to give proper notice or perform work correctly are billed as extra code-enforcement inspections or re-inspections at the adopted fee schedule rate under Section 19, payable before further inspections proceed. Occupying a building without the required inspections and certificate of occupancy is a misdemeanor under N.C.G.S. § 143-138(h) per Section 24, and the Inspector may order utility service disconnected under Section 25.
Frequently Asked Questions
What inspections does Pitt County require during construction?
Can construction continue past a Pitt County inspection point without approval?
Do Pitt County inspectors have a right to enter a construction site?
Sources & Official References
Other rules in Pitt County
Compare Pitt County to another location·View the North Carolina building safety overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.