Skip to main content
CityRuleLookup

Anne Arundel County, MD Building Safety: Plumbing Permits (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Adopted code
2021 International Plumbing Code
Permit required
Construction Code § 105.1
Applicant must be
licensed under § 11-4-605(a)/(c)/(d)
New single-family fixture fee
$173
First-violation civil fine
$125 (Class D)

Summary

Anne Arundel County adopts the 2021 International Plumbing Code and requires a permit before any plumbing work; only a licensed plumber under § 11-4-605 may apply, and unpermitted work is a Class D civil offense.

City-specific rules exist: Annapolis has its own plumbing permits rules that differ from Anne Arundel County's county-level regulations. If you live in Annapolis, check the city-specific page instead.

105.1 Required. Any owner or authorized agent who intends to ... erect, install, enlarge, alter, repair, remove, convert, or replace any electrical, gas, mechanical, or plumbing system ... shall first make application to the Code Official and obtain the required permit. ... 105.3.5 Application for plumbing permit. To obtain a plumbing permit, the applicant shall be the holder of the applicable license described under § 11-4-605(a), (c), or (d) of the County Code.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: 2026 S-93: County Code is current through May, 2026).

Full Breakdown

Anne Arundel County has adopted the 2021 International Plumbing Code by reference (§ 15-2-502), administered through the Construction Code Supplement's Chapter 1. Before anyone installs, alters, repairs, or replaces plumbing, the owner or agent must file a permit application with the Department of Inspections and Permits (Construction Code § 105.1); the applicant must hold the plumbing license described in § 11-4-605(a) master plumber, (c) disposal system contractor, or (d) utility contractor (Construction Code § 105.3.5). Permit fees run from $86 for a new multifamily unit's fixtures up to $2,595 for a large commercial onsite sewage system (Construction Code § 108.2.6). This applies countywide, including unincorporated Glen Burnie and Severna Park; Annapolis and Highland Beach issue permits under their own codes.

Violations & Fines

Performing plumbing work without a permit, or beyond what a permit authorizes, is a Class D civil offense under Construction Code § 113.5.7, $125 for a first violation, $500 for a second, and $1,000 for a third or later violation (§ 9-2-101).

Frequently Asked Questions

Do I need a plumbing permit if I live in Glen Burnie or Severna Park?
Yes. Both are unincorporated, so the County Construction Code applies directly: a permit from the Department of Inspections and Permits is required before plumbing work starts.
Can a homeowner pull their own plumbing permit?
No. Only a person holding the license under § 11-4-605(a), (c), or (d), master plumber, disposal system contractor, or utility contractor, may apply for the permit.

Sources & Official References

Other rules in Anne Arundel County

All Anne Arundel County rules

Compare Anne Arundel County to another location·View the Maryland building safety overview

Get notified when Plumbing Permits in Anne Arundel County, MD changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Plumbing Permits in Cities Across Anne Arundel County