Pitt County, NC Building Safety: Plumbing Permits (2026)
Key Facts
- Code adopted
- NC State Plumbing Code
- Sewer connection approval
- By county health department
- Pre-underslab inspection
- Before concrete placed
- Permit issuer
- Pitt County Inspections Department
- Owner-permit allowed
- If owner occupies 12+ months
Summary
Pitt County requires every building intended for human habitation to have plumbing installed under the North Carolina State Plumbing Code, connected to an approved sanitary sewer or disposal system, and requires an Inspections Department permit before plumbing work begins.
Every Building or structure intended for human habitation, occupancy, or use shall have plumbing systems or plumbing fixtures installed, constructed, altered, extended, repaired or reconstructed in conformance with the minimum standards, requirements and other provisions of the North Carolina State Plumbing Code. All plumbing systems shall be connected to a sanitary sewer system or other disposal system that has been approved by the county health department.
Full Breakdown
Section 8(B) of the Building Codes Enforcement Ordinance provides that every building or structure intended for human habitation, occupancy, or use shall have plumbing systems or fixtures installed, constructed, altered, extended, repaired or reconstructed in conformance with the minimum standards of the North Carolina State Plumbing Code, and requires that all plumbing systems connect to a sanitary sewer system or other disposal system approved by the county health department. Section 5 confirms the Plumbing Code is one of the components of the North Carolina State Building Code adopted as Pitt County's building code.
Section 14(B) requires a permit for the installation, extension or general repair of any plumbing system. Section 19(B) requires a pre-underslab inspection after plumbing facilities are roughed in, before concrete is placed, and Section 19(D) requires a frame/rough-in inspection after plumbing pipes are installed but before they are covered by insulation or finishes. As with other trades, Section 17(F) allows an owner-occupant to pull a personal plumbing permit if they will occupy the structure at least 12 months after completion and satisfy the Inspector they are competent to do the work.
Violations & Fines
Occupying a building whose plumbing has not passed the required inspections and received a certificate of occupancy is a misdemeanor under N.C.G.S. § 143-138(h) per Section 24. The Inspections Department may withhold permits from contractors with uncorrected violations, and may revoke a plumbing permit under Section 28 (N.C.G.S. § 153A-362) for substantial departure from approved plans, false statements, or failure to comply with the code.
Frequently Asked Questions
What plumbing code applies in Pitt County?
When does Pitt County inspect plumbing before it's covered up?
Who approves a septic or sewer connection for new plumbing in Pitt County?
Sources & Official References
Other rules in Pitt County
Compare Pitt County to another location·View the North Carolina building safety overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.