Harford County, MD Building Safety: Plumbing Permits (2026)
Key Facts
- Adopted code
- 2021 Intl. Plumbing & Fuel Gas Codes, § 202-1
- Registration required
- Harford County Code § 202-4
- Application fee
- $30 nonrefundable
- First fixture (residential)
- $75
- First fixture (commercial)
- $200
- Backflow preventer permit
- $250 each
Summary
Harford County adopted the 2021 International Plumbing Code and International Fuel Gas Code by reference under § 202-1, and § 202-4 requires anyone doing plumbing or gas fitting work to hold a county certificate of registration. Permit fees start at a $30 application charge plus $75 for the first fixture.
The 2021 International Plumbing Code (hereinafter referred to as the Plumbing Code), is hereby adopted and, by reference thereto, is made a part of this chapter with the same force and effect as though set out in full herein, except for such changes, amendments and revisions as are specified in this chapter... No person shall provide plumbing and/or gas fitting services in Harford County unless that person holds a valid certificate of registration issued by the Department of Inspections, Licenses and Permits.
Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: rev 4988582; v46 updated 2026-06-09; through 06-09-2026).
Full Breakdown
Section 202-1 adopts the 2021 International Plumbing Code and the 2021 International Fuel Gas Code, published by the International Code Council and American Gas Association, plus the plumbing and fuel-gas chapters of the 2021 International Residential Code, each made part of Chapter 202 with the same force and effect as if printed in full, subject to the local changes specified in the chapter. A copy of each adopted code must be kept on file for public inspection in the office of the Director of Administration.
Section 202-3 states the chapter governs all plumbing and gas fitting work performed in the county, and § 202-4 bars anyone from providing plumbing or gas fitting services without a valid certificate of registration from the Department of Inspections, Licenses and Permits, issued to applicants who already hold the required state license or certificate. Chapter 157's fee schedule at § 157-17 sets the permit costs: a $30 nonrefundable application fee applies to every plumbing permit application, then residential new installation, reconstruction or additions run $75 for the first fixture and $10 for each additional fixture, while business, commercial and industrial work runs $200 for the first fixture and $10 for each additional one.
Utility connections are itemized separately: a sewer connection is $60, a water service connection is $60, and a combined sewer-and-water connection is $120, with the same $60 charged to abandon either a sewer line or a water service. A testable backflow preventer costs $250 each, a filter or water conditioner is $125, a commercial grease or oil interceptor is $125, and a sump pump permit is $40. Commercial on-site utility work is $225 per new storm sewer, water or sewer installation, and $100 for repair or replacement of each.
Violations & Fines
Providing plumbing or gas fitting services without the certificate of registration required by § 202-4 is a violation of the chapter. Under the countywide license and permit rules of § 1-22, the county may refuse to issue, or may suspend or revoke, a certificate of registration after notice and hearing for violating the code, and a permit disapproved or withdrawn before issuance is refunded only 50% of the fee paid under § 157-3(E).
Frequently Asked Questions
What plumbing code does Harford County use?
Do I need a license to do plumbing work in Harford County?
How much is a residential plumbing permit?
What does a sewer or water connection permit cost?
Sources & Official References
Other rules in Harford County
Compare Harford County to another location·View the Maryland building safety overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.