Key Facts

Standard front setback
35 feet minimum
Sewer-served lot exception
25 feet on non-arterial street
Corner lot side setback
25 feet minimum
Collector/Arterial frontage
50 feet front setback
Governing rule
Subdivision Regulations, not zoning
Enforcing office
Public Works / County Engineer

Summary

Madison County has no zoning code, but its Subdivision Regulations set numeric yard setbacks for every new lot created in the unincorporated county. Under Section 4.3.7(13), front building setback lines must run at least 35 feet from the property line on most lots, tightening to 25 feet where public sewer serves the lot and widening to 50 feet on roads classified Collector or Arterial.

City-specific rules exist: Huntsville, and Madison have their own setback rules rules that differ from Madison County's county-level regulations. If you live in one of those cities, check the city-specific page instead.

All proposed front minimum Building Setback Lines are not to be less than thirty-five (35) feet in width. The aforementioned Building Setback Lines do not apply if the Lot will be served by an approved sanitary sewer system and located on a Street other than a Collector Street or an Arterial. In that case, only front minimum Building Setback Lines must be a minimum of twenty-five (25) feet from the property boundary. If the Lot is a Corner Lot, the minimum front setback line must be thirty-five (35) feet from the property boundary, and the minimum side setback line must be twenty-five (25) feet from the property boundary. If a Lot is located on a Collector or Arterial, as per the classification of the roadway shown on the Alabama Department of Transportation Highway Functional Classification Map, latest edition, the minimum front building setback shall be fifty (50) feet.

Full Breakdown

The Madison County Subdivision Regulations, last revised effective September 1, 2017, are the only source of yard setbacks in the unincorporated county: the county has never adopted a zoning ordinance, so these dimensional standards apply only to land going through the plat-approval process, not to existing lots outside a subdivision. 7(13) requires every Proposed Plat to show a front minimum Building Setback Line of at least 35 feet. That baseline drops to 25 feet only if the lot will be served by an approved sanitary sewer system and fronts a street that is not a Collector or an Arterial.

Corner lots get a mixed standard: the front line stays at 35 feet and a 25-foot minimum side setback line is added along the second frontage. Where a lot fronts a road classified as a Collector or an Arterial on the Alabama Department of Transportation's Highway Functional Classification Map, the front setback jumps to 50 feet regardless of sewer service. 1. Because the standard is tied to the subdivision process rather than a citywide zoning map, a builder on an existing unsubdivided parcel in the unincorporated county should confirm with the Public Works Department (256-746-2900) whether the parcel was platted under these Regulations before assuming a setback applies.

Violations & Fines

Section 2.3.2 makes violating any Subdivision Regulation, including the Section 4.3.7(13) setback lines, punishable by the fine set out in Code of Alabama § 11-24-3 et seq., and lets the County file a civil action to enjoin noncompliant work. The County Engineer enforces the Regulations and reports violations to the Commission under Section 2.3; the Probate Judge cannot record a Final Plat that fails to meet these lines.

Frequently Asked Questions

Does Madison County have a zoning ordinance setting setbacks?
No. Madison County has never adopted zoning in the unincorporated area. The 35-foot front setback comes from Section 4.3.7(13) of the county's Subdivision Regulations, which applies only to lots created through the plat-approval process, not as a general zoning rule for every parcel.
When does the setback drop to 25 feet?
Only when the lot will be served by an approved sanitary sewer system and fronts a street that is not classified as a Collector or an Arterial. If either condition fails, the standard 35-foot front line applies, and corner lots always carry a 25-foot side setback in addition.
What triggers the 50-foot setback?
A lot fronting a road classified as a Collector or an Arterial on the Alabama Department of Transportation's Highway Functional Classification Map must carry a 50-foot front building setback line, regardless of whether the lot has sewer service.
Who enforces these setback lines?
The Madison County Engineer within Public Works reviews every Proposed Plat for compliance with Section 4.3.7 before it advances to Final Plat approval by the Commission and recording with the Probate Judge; noncompliant plats are not approved.

Sources & Official References

Other rules in Madison County

All Madison County rules

Compare Madison County to another location·View the Alabama building setbacks & zoning overview

Get notified when Setback Rules in Madison County, AL changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Setback Rules in Cities Across Madison County