San Luis Obispo County, CA Environmental Rules: Boat Dock Permits (2026)
Key Facts
- Permit required
- Planning dept. permit, Sec. 19.20.126
- Engineer required
- Docks over 400 sq ft or 50 ft
- Encroachment permit
- Separate permit for county property
- Corps of Engineers
- Federal permit required first, if applicable
- Restrooms
- 2 per 75 mooring spaces
- Railings
- 42 in. high, 20 lb/ft load
- Lighting
- 5 foot-candles minimum, passenger areas
Summary
San Luis Obispo County requires a planning department permit before anyone builds a dock, marina or similar floating structure in county waters. Section 19.20.126 sets the application paperwork, engineering thresholds, and stacking permits, while Sections 19.20.128 and 19.20.130 add safety and sanitary standards for the finished facility.
A permit shall be obtained from the planning department as set forth in Chapter 19.02 of this title prior to any construction of docks, marinas and work of a similar nature as follows:(1)Application Content and Filing. Plans to be submitted for approval shall include: complete working drawings, plot plan with parking layout, schematics of electrical and mechanical work, and such other plans as may be required to effect completion of the work in a manner satisfactory to the building official. Such plans shall be submitted in duplicate to the planning department. When the facility to be constructed includes plumbing facilities, plans shall be submitted in triplicate.(2)Plan Preparation. A registered civil engineer shall prepare plans for all floating marinas and any floating dock in excess of four hundred square feet in area or fifty feet in length measured perpendicular to the shoreline.(3)Encroachment Permit Required. Encroachment permits shall be required prior to any construction done on or in conjunction with county property.
Full Breakdown
02, before any construction of docks, marinas or similar work. Applicants submit complete working drawings, a plot plan with parking layout, and electrical and mechanical schematics in duplicate, or in triplicate if plumbing facilities are involved. A registered civil engineer must prepare the plans for any floating marina, and for any floating dock exceeding 400 square feet in area or 50 feet in length measured perpendicular to the shoreline. An encroachment permit is separately required for any construction on or connected to county property, and where the Army Corps of Engineers also requires a permit for the marine construction, that federal permit must be secured before the county issues its own.
122 allows alternate designs on approval of the building official, who may demand extra provisions in areas subject to heavy wave action. 128 requires operable firefighting equipment for all commercially operated marinas and docks, domestic water service meeting health department minimums, a minimum five-foot-candle lighting level on commercial piers and floats used for passenger loading, and railings engineered for a 20-pound-per-lineal-foot horizontal load with a minimum height of 42 inches. 130 adds sanitary standards: public floating docks and marinas need at least two restrooms, one for each sex, per 75 mooring spaces, with no berth more than 400 feet from a restroom, and sewage removal approved by the health department at the time construction plans are submitted.
04 separately require board-of-supervisors permission and an annual fee to install a power hoist on a county wharf, and a per-boat mooring license fee for anyone using a county wharf as a mooring place.
Violations & Fines
Building a dock, marina or similar floating structure without the Section 19.20.126 planning department permit, without the required encroachment permit, or without a prerequisite Army Corps of Engineers permit exposes the project to stop-work action and permit denial. Commercial facilities that skip the firefighting equipment, lighting, railing or restroom-ratio standards in Sections 19.20.128 and 19.20.130 are out of compliance with the construction standards chapter and can be held from final inspection.
Frequently Asked Questions
Who needs a permit to build a private dock in San Luis Obispo County?
When does a dock need engineered plans from a registered civil engineer?
What safety features does a commercial dock or marina need?
Does a public marina need a set number of restrooms?
Sources & Official References
Other rules in San Luis Obispo County
California rules heatmap·Compare San Luis Obispo County to another location·View the California environmental rules overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.