Skip to main content
CityRuleLookup

Palm Beach County, FL Environmental Rules: Boat Dock Permits (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified August 2026

Key Facts

Residential dock setback
5 feet from side property lines
Large facilities
5+ slip projects need Manatee Protection Plan review
Before you build
Building Division construction permit required
Jurisdiction
Unincorporated county only, not the 39 cities

Summary

In unincorporated Palm Beach County, accessory boat docks on a residential lot must clear a five-foot side setback, and any dock, seawall, bulkhead, or pier built in state waters needs a Building Division construction permit first.

City-specific rules exist: Jupiter, West Palm Beach, and Boca Raton have their own boat dock permits rules that differ from Palm Beach County's county-level regulations. If you live in one of those cities, check the city-specific page instead.

Accessory docks located on the same lot as a residence shall meet a five-foot setback from the side property lines. Accessory docks not located on the same lot as a residence shall comply with the following setbacks: 1) Dock in Publicly-Owned Waterway A minimum five-foot side setback measured from the extension of the property lines into the waterway. The property lines shall be extended into the waterway in the same direction and bearing as the side lot lines.

Full Breakdown

The ULDC requires accessory docks on the same lot as a residence to sit at least five feet from the side property lines. Docks not on a residential lot must keep the same five-foot side setback, measured from the extension of the property lines into the waterway if it is publicly owned, or get the waterway owner's signed consent if it is privately owned. New marine facilities or expansions of five or more slips must also follow the county's Manatee Protection Plan. Before construction starts, the Building Division requires a permit for any seawall, bulkhead, dock, or pier built in waters of the state. Applies only outside the county's 39 municipalities.

Violations & Fines

Building a dock, seawall, bulkhead, or pier without the required Building Division construction permit is a code violation subject to stop-work orders and enforcement action.

Frequently Asked Questions

Do I need a permit to build a dock in unincorporated Palm Beach County?
Yes. The Building Division requires a construction permit for any seawall, bulkhead, dock, or pier built in waters of the state, in addition to any required state permits, under ULDC Art. 11.B.6.B.
How far must my dock be from my neighbor's property line?
An accessory dock on the same lot as a residence must clear a five-foot setback from the side property lines, per ULDC Art. 5.B.1.A.5.

Sources & Official References

Other rules in Palm Beach County

All Palm Beach County rules

Florida rules heatmap·Compare Palm Beach County to another location·View the Florida environmental rules overview

Get notified when Boat Dock Permits in Palm Beach County, FL changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Boat Dock Permits in Cities Across Palm Beach County