Collier County, FL Environmental Rules: Erosion Control (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Silt fence trigger
Lake construction contiguous to new work
Removal condition
Only after adjacent work approved
Alternate methods
Must meet federal AND state standards
Approving official
Engineering Services Director or designee
Inspection frequency
Monthly, all excavation types

Summary

Any commercial, development or private excavation permitted under Collier County's Excavation Regulations must go up with erosion control already in place. A silt fence is required around every lake edge that borders new construction, and it has to stay up until the adjacent work is inspected and approved by the Engineering Services Department.

These county ordinances apply to unincorporated areas of Collier County. Incorporated cities within the county may have their own rules that take precedence over county-level regulations.

Erosion control. Upon completion of any lake construction, a silt fence must be installed around all portions of the lake which are contiguous to proposed new construction. Portions of the silt fence may be removed after the new construction (i.e. residences, roads, drainage) adjacent to that section of silt fence has been approved. Alternate means of erosion control, meeting federal and state standards, may be approved by the Engineering Services Director, or designee, upon submittal of a plan showing the proposed erosion control method.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 126 | Land Development Code: Supplement 33).

Full Breakdown

Sec. 22-112(11) of the Collier County Excavation Regulations requires that, upon completion of any lake construction, a silt fence be installed around all portions of the lake contiguous to proposed new construction such as homes, roads or drainage improvements. Sections of that silt fence may only come down after the adjacent construction has been approved by the county. A permittee who wants to use something other than silt fence must submit a plan to the Engineering Services Director or designee showing the proposed alternate method, and that method must still meet federal and state erosion-control standards, not just the county's own.

This sits inside a broader construction-requirements article covering excavation depth limits in Estates zoning, sideslope ratios, building-envelope sizing, littoral zone plantings and required SFWMD/DEP/USACE permits where jurisdictional wetlands are involved. Compliance is checked through monthly inspections under Sec. 22-113, and commercial and development excavations must also file annual and final status reports, including sealed topographic surveys, verifying as-built slopes match the approved design. Excavation permits also carry a performance guarantee of $25,000 to $1,000,000 under Sec. 22-115, computed per foot of lake bank perimeter, which the county can draw on to correct erosion or other violations if the permittee does not.

Violations & Fines

Violating any part of the Excavation Regulations, including the erosion-control requirement, is prosecuted and punished under F.S. § 125.69, with each day of the violation treated as a separate offense under Sec. 22-117. The county manager or designee can issue stop-work orders across the whole site, and the Board of County Commissioners or any adversely affected person may sue in circuit court to enjoin the violation. Failure to correct within 15 days of written notice from the county can lead to suspension or revocation of the excavation permit.

Frequently Asked Questions

Does Collier County require silt fencing during lake excavation?
Yes. Sec. 22-112(11) requires a silt fence around every part of the lake that borders new construction once the lake work is complete, and it can only come down after the adjacent construction passes county approval.
Can a contractor use something other than silt fence for erosion control?
Only with prior approval. The Engineering Services Director or designee must approve an alternate erosion-control plan, and that method still has to meet federal and state erosion standards, not a lower local bar.
What happens if erosion control is missing from an excavation site?
It is a violation of the Excavation Regulations, prosecuted under F.S. § 125.69 with each day treated as a separate offense, and the county can suspend the excavation permit or issue a stop-work order until the site is corrected.

Sources & Official References

Other rules in Collier County

All Collier County rules

Florida rules heatmap·Compare Collier County to another location·View the Florida environmental rules overview

Get notified when Erosion Control in Collier County, FL changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.