Skagit County, WA Environmental Rules: Erosion Control (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Governing section
SCC 14.32.130
Civil penalty
$100 per day per violation
Civil infraction default
$250, Class 1
Enforcing agency
Planning and Development Services
Road sediment cleanup
Required by end of same day

Summary

In unincorporated Skagit County, SCC 14.32.130 requires every development project to control erosion and sedimentation during construction. Crews must keep stabilizing materials on hand year-round, mark clearing limits before grading, and clean any sediment tracked onto paved roads by the end of each work day. Planning and Development Services enforces the standard.

These county ordinances apply to unincorporated areas of Skagit County. Incorporated cities within the county may have their own rules that take precedence over county-level regulations.

All development must control erosion and sedimentation during construction. In addition to the requirements of the stormwater management manual, development must do the following: ... (a) Stabilization of Exposed Soils. At all times of the year, sufficient materials, equipment, and labor must be readily available to stabilize and prevent erosion. All exposed, disturbed soils must be stabilized prior to any forecasted rain event. ... (c) Construction Access Routes. Wherever construction vehicle access routes intersect paved roads, provisions must be made to minimize the transport of sediment (mud) onto the paved road by use of appropriate BMPs such as a stabilized construction entrance. If sediment is transported onto a road surface, at a minimum, the roads must be thoroughly cleaned at the end of each day.

Full Breakdown

130 makes stabilization of exposed soils a continuous, year-round duty: sufficient materials, equipment, and labor must be readily available to stabilize and prevent erosion, and all exposed, disturbed soils must be stabilized before any forecasted rain event. Before land clearing begins, clearing limits, setbacks, buffers, and sensitive or critical areas such as steep slopes, wetlands, wellhead protection areas, and riparian corridors must be clearly marked in the field and inspected by County staff, or by the applicant's own critical areas consultant where appropriate. Wherever construction traffic crosses a paved road, the project must use best management practices such as a stabilized construction entrance to keep mud off the pavement; if sediment does reach the road, crews must clean it by the end of that day, removing it by shoveling or sweeping to a controlled sediment disposal area, and street washing is allowed only after that removal and only if no drainage system or wildlife habitat will be harmed.

Dewatering devices used on a construction site must discharge into a sediment trap or pond with adequate energy dissipation before water leaves the site. 32. These duties apply on top of, not instead of, the county's stormwater management manual.

Violations & Fines

Planning and Development Services can issue a stop work order and administrative order under SCC 14.09.220 for an active erosion-control violation. A civil penalty of $100 per day per violation applies under SCC 14.09.330(2)(a), and each day a violation continues counts as a separate offense under SCC 14.09.120(5). A person who causes a violation may instead face a Class 1 civil infraction with a default penalty of $250 under SCC 14.09.320, and the property owner is jointly and severally liable for penalties and site restoration.

Frequently Asked Questions

Does unincorporated Skagit County require erosion control during construction?
Yes. SCC 14.32.130 requires every development project to control erosion and sedimentation, keeping stabilization materials and labor available year-round and stabilizing exposed, disturbed soils before any forecasted rain event.
What if my construction site tracks mud onto a paved county road?
SCC 14.32.130(1)(c) requires a stabilized construction entrance or similar BMP where site traffic meets pavement. If sediment reaches the road anyway, it must be cleaned by shoveling or sweeping to a controlled disposal area by the end of that same day.
Who enforces erosion control violations in unincorporated Skagit County?
Planning and Development Services enforces SCC Title 14. The Director can issue stop work and administrative orders under SCC 14.09.220, and violators face a $100-per-day civil penalty under SCC 14.09.330 or a $250 civil infraction under SCC 14.09.320.

Sources & Official References

Other rules in Skagit County

All Skagit County rules

Compare Skagit County to another location·View the Washington environmental rules overview

Get notified when Erosion Control in Skagit County, WA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.