Skip to main content
CityRuleLookup

Mendocino County, CA Environmental Rules: Erosion Control (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Governing section
Mendocino County Code § 18.70.130
Coastal zone development trigger
>2 cubic yards graded
Coastal permit required
Coastal Development Permit, § 20.532.010
Cross-referenced coastal chapters
Ch. 20.492, Ch. 16.30
Engineered grading threshold
5,000 cubic yards

Summary

Anyone grading in unincorporated Mendocino County must control erosion on cut and fill slopes, typically with planting installed before the county signs off on final approval, and the Building Official can also require check dams, cribbing, or riprap. In the Coastal Zone, grading over two cubic yards counts as "development" and needs a Coastal Development Permit on top of the standard erosion-control rule.

These county ordinances apply to unincorporated areas of Mendocino County. Incorporated cities within the county may have their own rules that take precedence over county-level regulations.

(A)Slopes. The faces of cut and fill slopes shall be prepared and maintained to control against erosion. This control may consist of effective planting. The protection for the slopes shall be installed as soon as practicable and prior to calling for a final approval. Where cut slopes are not subject to erosion due to the erosion-resistant character of the materials, such protection may be omitted.(B)Other Devices. Where necessary, check dams, cribbing, riprap or other devices or methods shall be employed to control erosion and provide safety.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 75).

Full Breakdown

Under Sec. 130, cut and fill slope faces from a permitted grading project must be prepared and maintained against erosion, generally through effective planting installed as soon as practicable and before the county grants final approval; slopes made of erosion-resistant material can skip this if the Building Official agrees, and check dams, cribbing, or riprap can be required wherever necessary. A grading permit is required for excavation or fill above small thresholds set in Sec. 5:1, or fills exceeding one foot on slopes flatter than 5:1; projects moving more than 5,000 cubic yards are designated "engineered grading" under Sec.

060(C) and require soils engineering and engineering geology reports. 150(B) ties erosion control directly to project sign-off: final approval is withheld until all drainage facilities, their protective devices, and erosion-control measures are complete and the required as-built reports are submitted. In the county's Coastal Zone, Sec. 027 treats grading moving more than two cubic yards of material as "development" under the Mendocino County Coastal Zoning Code, which Sec. 010 requires to secure a Coastal Development Permit, subject to limited exemptions in Sec. 30 (Stormwater Runoff Pollution Prevention Procedure).

Violations & Fines

If an existing excavation, embankment, or fill becomes a hazard to life, limb, or property, or endangers a public way or drainage channel, Sec. 18.70.040 lets the Building Official order the responsible owner in writing to repair or eliminate it within a specified period. Final grading approval is withheld under Sec. 18.70.150 until erosion-control measures, drainage facilities, and completion reports are in place, and grading without the required permit or coastal development permit exposes the property to Title 18's general permit-violation fee structure.

Frequently Asked Questions

Do I need erosion control if I'm grading my property in Mendocino County?
Yes, once a grading permit applies. Section 18.70.130 requires cut and fill slope faces to be protected against erosion, generally through planting installed before final approval, with check dams, cribbing, or riprap required wherever the Building Official finds them necessary.
Does erosion control work differently in Mendocino County's Coastal Zone?
Yes. Section 18.70.027 defines grading of more than two cubic yards in the Coastal Zone as 'development,' which Sec. 20.532.010 requires a Coastal Development Permit for, in addition to the county's standard grading and erosion-control rules and the county's separate stormwater runoff pollution prevention chapter.
What happens if my finished grading starts eroding later?
The Building Official can act under Sec. 18.70.040 if an existing cut, fill, or excavation becomes a hazard to life, property, or a public drainage channel, ordering the owner in writing to repair or eliminate the condition within a set period to bring it back into conformance.

Sources & Official References

Other rules in Mendocino County

All Mendocino County rules

California rules heatmap·Compare Mendocino County to another location·View the California environmental rules overview

Get notified when Erosion Control in Mendocino County, CA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.