Jackson County, MS Environmental Rules: Erosion Control (2026)
Key Facts
- Governing law
- Zoning Ordinance Article 11
- Enforcing agency
- Jackson County Permits Office
- 0-0.9 acre disturbed
- No permit/SWPPP unless larger plan
- 1-5 acres disturbed
- County permit, NOI and SWPPP required
- Over 5 acres
- MDEQ permit required, copy to county
- Design storm standard
- 25-year design storm frequency
Summary
Jackson County requires erosion and sediment control measures on every subdivision, site plan and building permit in the unincorporated county. No final plat, construction plan, site plan or building permit is approved unless it includes temporary and permanent controls that keep silt out of downstream drainage ways.
No final subdivision plat, subdivision construction plan, site plan or building permit shall be approved by the County unless the plans for the proposed development include temporary and permanent erosion and sedimentation control measures such that siltation of downstream drainage ways are minimized. The above requirement shall be accomplished through a combination of the following practices: a. installation of structural BMPs before and during construction in order to reduce on-site soil erosion and provide temporary capture of sediment; b. temporary and/or permanent revegetation of bare ground in order to stabilize disturbed soil at the earliest practicable date; c. construction of on-site Stormwater detention facilities by the landowner or developer in a manner such that detention ponds function as temporary sedimentation basins until permanent revegetation of the subject tract is accomplished; d. Control of construction debris, litter and sanitary wastes through appropriate and acceptable means; and e. Other measures which may be necessary to control erosion and sedimentation on a site-by-site basis.
Official source re-checked September 8, 2026: the cited page had not changed since it was quoted.
Full Breakdown
The Jackson County Zoning Ordinance regulates erosion and sedimentation under Article 11, Stormwater Runoff, Illicit Discharges, and Illegal Connections. 1 bars any landowner from permitting soil, sand or gravel to erode off a parcel onto adjoining property, a public street, a drainage channel or the County Drainage System, covering both pre-construction and post-construction conditions. 9 acre needs no permit or SWPPP unless it is part of a larger common plan of development or sale, 1 to 5 acres requires a county permit with a Notice of Intent and SWPPP filed with the County Permits Office, and anything above 5 acres requires an MDEQ permit with the approved MDEQ paperwork copied to the county.
3 folds in NPDES construction and industrial stormwater permits, including a ban on dumping excess cement or washing out cement trucks into the county drainage system, and requires all residential and commercial construction to design sediment and erosion control measures for a 25-year storm frequency, with post-construction drainage design following the Mississippi Department of Transportation Roadway Design Manual, Chapter 7. 3 makes final plat, construction plan, site plan and building permit approval by the county conditional on temporary and permanent erosion and sedimentation controls, achieved through structural best management practices installed before and during construction, temporary or permanent revegetation of bare ground, on-site stormwater detention doubling as temporary sedimentation basins, and control of construction debris, litter and sanitary waste.
Violations & Fines
The Jackson County Planning Department and Permits Office withhold final plat, site plan and building permit approval until an adequate drainage report, construction plans and erosion control measures are on file; work proceeding without the required permit or SWPPP, or a discharge that damages adjoining property or the county drainage system, is itself the code violation under Section 11.1 and Section 11.3.
Frequently Asked Questions
Do I need a permit to clear less than an acre in Jackson County?
What triggers an MDEQ permit instead of a county permit?
Can the county hold up my building permit over erosion control?
Sources & Official References
Other rules in Jackson County
Compare Jackson County to another location·View the Mississippi environmental rules overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.