Skagit County, WA Environmental Rules: Erosion Control (2026)
Key Facts
- Governing section
- SCC 14.32.130
- Civil penalty
- $100 per day per violation
- Civil infraction default
- $250, Class 1
- Enforcing agency
- Planning and Development Services
- Road sediment cleanup
- Required by end of same day
Summary
In unincorporated Skagit County, SCC 14.32.130 requires every development project to control erosion and sedimentation during construction. Crews must keep stabilizing materials on hand year-round, mark clearing limits before grading, and clean any sediment tracked onto paved roads by the end of each work day. Planning and Development Services enforces the standard.
All development must control erosion and sedimentation during construction. In addition to the requirements of the stormwater management manual, development must do the following: ... (a) Stabilization of Exposed Soils. At all times of the year, sufficient materials, equipment, and labor must be readily available to stabilize and prevent erosion. All exposed, disturbed soils must be stabilized prior to any forecasted rain event. ... (c) Construction Access Routes. Wherever construction vehicle access routes intersect paved roads, provisions must be made to minimize the transport of sediment (mud) onto the paved road by use of appropriate BMPs such as a stabilized construction entrance. If sediment is transported onto a road surface, at a minimum, the roads must be thoroughly cleaned at the end of each day.
Full Breakdown
130 makes stabilization of exposed soils a continuous, year-round duty: sufficient materials, equipment, and labor must be readily available to stabilize and prevent erosion, and all exposed, disturbed soils must be stabilized before any forecasted rain event. Before land clearing begins, clearing limits, setbacks, buffers, and sensitive or critical areas such as steep slopes, wetlands, wellhead protection areas, and riparian corridors must be clearly marked in the field and inspected by County staff, or by the applicant's own critical areas consultant where appropriate. Wherever construction traffic crosses a paved road, the project must use best management practices such as a stabilized construction entrance to keep mud off the pavement; if sediment does reach the road, crews must clean it by the end of that day, removing it by shoveling or sweeping to a controlled sediment disposal area, and street washing is allowed only after that removal and only if no drainage system or wildlife habitat will be harmed.
Dewatering devices used on a construction site must discharge into a sediment trap or pond with adequate energy dissipation before water leaves the site. 32. These duties apply on top of, not instead of, the county's stormwater management manual.
Violations & Fines
Planning and Development Services can issue a stop work order and administrative order under SCC 14.09.220 for an active erosion-control violation. A civil penalty of $100 per day per violation applies under SCC 14.09.330(2)(a), and each day a violation continues counts as a separate offense under SCC 14.09.120(5). A person who causes a violation may instead face a Class 1 civil infraction with a default penalty of $250 under SCC 14.09.320, and the property owner is jointly and severally liable for penalties and site restoration.
Frequently Asked Questions
Does unincorporated Skagit County require erosion control during construction?
What if my construction site tracks mud onto a paved county road?
Who enforces erosion control violations in unincorporated Skagit County?
Sources & Official References
Other rules in Skagit County
Compare Skagit County to another location·View the Washington environmental rules overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.