San Luis Obispo County, CA Environmental Rules: Flood Elevation Requirements (2026)
Key Facts
- Size trigger
- Over 50 lots or 5 acres, whichever less
- Must identify
- Special Flood Hazard Area and Base Flood Elevation
- Building sites
- Must be "flood free" per Title 22/23
- Drainage basins
- Capped at 2 feet water, design storm
- Relief route
- Adjustment under Sec. 21.03.020
- Penalty
- Misdemeanor under Title 1 Ch. 1.04
- Appeal window
- 14 days to Board of Supervisors
Summary
San Luis Obispo County requires subdivision applicants to identify Special Flood Hazard Areas and Base Flood Elevations on any project of 50 lots or 5 acres or more, whichever is smaller, and to prove flood-free building sites before a tentative map is approved. The rule sits in the subdivision design standards and reaches mobile home park proposals too.
(5)Flood Hazard and Drainage.a.Where all or any portion of the subdivision is located within a flood hazard combining designation, evidence must be submitted to show that the parcels will have flood free building sites which satisfy the requirements of Title 22 or Title 23 of this code and shall have public utilities and facilities such as sewer, gas, electrical and water systems located and constructed to minimize flood damage. In addition, the subdivision must not cause a flood hazard to surrounding properties.b.Privately maintained drainage basins shall be designed to contain two feet of water or less under the design storm as measured from the lowest point in the basin...Where it is not feasible to construct a drainage basin containing two feet of water or less, an adjustment may be granted pursuant to Section 21.03.020.c.All new subdivision proposals and other proposed development, including proposals for mobile home parks and subdivisions, greater than 50 lots or 5 acres, whichever is the lesser, shall identify the Special Flood Hazard Areas (SFHA) and the Base Flood Elevations (BFE).
Full Breakdown
Section 21.03.010(5), Flood Hazard and Drainage, is one of the mandatory design-criteria findings the Planning Commission and Subdivision Review Board must make before approving any tentative parcel or tract map. Subsection (5)a requires evidence that parcels inside a flood hazard combining designation will have "flood free building sites" meeting Title 22 or 23 standards, with sewer, gas, electrical and water systems located and constructed to minimize flood damage, and bars the subdivision from creating a flood hazard for surrounding property. Subsection (5)b caps privately maintained drainage basins at two feet of water under the design storm, measured from the basin's lowest point, requires interior landscaping for erosion control and perimeter fencing that is landscaped to screen and soften it; a shallower-basin exception needs an adjustment under Sec. 21.03.020. Subsection (5)c is the elevation-mapping trigger itself: any new subdivision, including mobile home park proposals, larger than 50 lots or 5 acres, whichever is less, must identify both the Special Flood Hazard Area and the Base Flood Elevation for the site.
An applicant who cannot meet these standards may request an adjustment under Sec. 21.03.020, but the Planning Commission or Subdivision Review Board may grant one only after finding special circumstances affecting the subdivision, no material adverse effect on neighborhood health or safety, and no detriment to the public welfare or injury to other property. A denied map, or a notice of violation recorded under Sec. 21.07.020, is appealable to the Board of Supervisors within fourteen days of the decision.
Violations & Fines
Chapter 21.07 makes noncompliance with the subdivision title, including the flood-hazard findings of Sec. 21.03.010(5), a misdemeanor punishable under Title 1, Chapter 1.04 of the county code, and separately lets the county sue in San Luis Obispo Superior Court to enjoin an unlawful division, sale, lease or financing. A map missing the required SFHA/BFE identification cannot receive the design-criteria finding needed for tentative approval, and the Subdivision Review Board can record a notice of violation under Sec. 21.07.020 against noncompliant property.
Frequently Asked Questions
When must a San Luis Obispo County subdivision identify base flood elevations?
What counts as a "flood free building site" under the county's design criteria?
Can a developer get relief from the flood-hazard design standards?
What happens if a subdivider ignores the flood elevation requirement?
Sources & Official References
Other rules in San Luis Obispo County
California rules heatmap·Compare San Luis Obispo County to another location·View the California environmental rules overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.