Taylor County, TX Environmental Rules: Flood Elevation Requirements (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Freeboard minimum
12 inches above base flood elevation
Certified by
registered professional engineer's seal
Disclosed to buyers
flood-plain status, BFE, floor elevation
Permit required
Development Permit, County Environmental Dept.
Enforcing office
Development/Permitting, 325-674-1235
Governing sections
Art. VI §6.03(4); Art. IX §§9.01-9.03

Summary

Taylor County requires final subdivision plats in flood hazard areas to certify that finished floor elevations sit at least 12 inches above the base flood elevation (BFE). A licensed engineer must seal the statement, and Article IX makes sellers disclose the tract's flood-plain status, BFE, and minimum floor elevation before closing.

City-specific rules exist: Abilene has its own flood elevation requirements rules that differ from Taylor County's county-level regulations. If you live in Abilene, check the city-specific page instead.

“A flood hazard study has been performed and the development in the proposed subdivision will not adversely affect the interior or exterior storm water drainage or adjacent property owners. Base flood elevations (BFE) have been determined and Taylor County requires 12 inches above BFE as minimum to build elevation in a flood hazard area.”

Full Breakdown

03(4) of the Taylor County Development Procedures and Regulations requires every final plat covering land where a flood study was performed, whether a full or limited study, to carry a certified statement disclosing the flood hazard finding. The statement itself sets the numeric standard: Taylor County requires 12 inches above BFE as minimum to build elevation in a flood hazard area, and it must appear over the seal of the responsible public engineer, not just a staff signature. Article IX backs that plat statement with disclosure duties running to the next owner.

01 requires the plat to delineate how much of the subdivision lies in the flood plain. 02 requires any subdivision inside the county's flood plain management area to show compliance with those regulations before the plat is approved, and it requires the subdivider to tell a prospective buyer three specific things: whether the tract sits in a flood plain, the base flood elevation, and the minimum finished floor elevation. 03 goes further for lots in an identified flood hazard area: the owner must inform each prospective buyer in writing that a Development Permit from the Taylor County Environmental Department will be required before any structure can be placed on the property.

04 lets the Commissioners' Court withhold final plat action until requirements are met, a subdivider who omits the freeboard certification or the buyer disclosures can see plat approval delayed past the standard 60-day review clock. The Development/Permitting office (325-674-1235) and the Environmental Department administer both the plat-stage certification and the building-stage Development Permit.

Violations & Fines

A plat missing the sealed 12-inch freeboard statement or the flood-plain disclosures required by Art. IX §§ 9.01-9.03 will not clear Commissioners' Court review under the 60-day action clock in Art. VI § 6.04; the Commissioner can list it among the reasons for disapproval. Building below the certified elevation without the required Development Permit exposes the owner to permit denial and loss of flood-insurance eligibility for the structure.

Frequently Asked Questions

Does Taylor County require homes to be built above the base flood elevation?
Yes. Article VI § 6.03(4) of the county's Development Procedures and Regulations requires final plats in a flood hazard area to certify that Taylor County requires 12 inches above BFE as minimum to build elevation, sealed by the project engineer before the Commissioners' Court will accept the plat.
What must a subdivider tell a buyer about flood risk?
Under Article IX § 9.02, the subdivider must disclose whether the tract lies in a flood plain, the base flood elevation, and the minimum finished floor elevation. Section 9.03 adds a written notice that a Development Permit from the Environmental Department is required before building in an identified flood hazard area.
Who reviews the flood elevation certification before a plat is approved?
The Taylor County Development/Permitting office reviews the plat package, and the Commissioners' Court takes final action under Art. VI § 6.04. The Environmental Department separately issues the Development Permit required by Art. IX § 9.03 before construction can begin on a flood-hazard-area lot.

Sources & Official References

Other rules in Taylor County

All Taylor County rules

Texas rules heatmap·Compare Taylor County to another location·View the Texas environmental rules overview

Get notified when Flood Elevation Requirements in Taylor County, TX changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Flood Elevation Requirements in Cities Across Taylor County