Ouachita Parish, LA Environmental Rules: Flood Zones (2026)

Significant Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified August 2026

FEMA flood zone rules in Ouachita Parish, LA, also called floodplain regulations or special flood hazard area (SFHA) rules, determine flood insurance requirements and elevation standards for new construction.

Key Facts

Permit required
Before any development in flood hazard area, Sec. 21-102(a)
Applies to
Unincorporated parish only, Sec. 21-75
Floodway rule
Encroachment banned absent study, Sec. 21-119
Flood maps
FEMA FIRM dated March 15, 1994, Sec. 21-76
Penalty
Up to $500 fine or 30 days jail, Sec. 21-77
Appeals
Program administrator, then Police Jury, then courts

Summary

Any construction or land-disturbing development inside an area of special flood hazard in unincorporated Ouachita Parish needs a development permit before work starts, per Sec. 21-102. The rule covers only parish territory outside Monroe, West Monroe and Sterlington, and the program administrator reviews every application against the FEMA flood maps adopted at Sec. 21-76.

These county ordinances apply to unincorporated areas of Ouachita Parish. Incorporated cities within the county may have their own rules that take precedence over county-level regulations.

To ensure conformance with the provisions of this article, a development permit shall be required before any construction or development begins with any area of special flood hazard as established in Section 21-76...

Full Breakdown

Article III of Chapter 21, Storm Drainage and Flood Control, applies to all areas of special flood hazard in Ouachita Parish that fall within the police jury's jurisdiction and outside the corporate limits of incorporated municipalities (Sec. 21-75); Monroe, West Monroe and Sterlington administer their own flood ordinances. Sec. 21-102(a) requires a development permit before any construction or development begins in an area of special flood hazard identified on the parish's FEMA maps, and the application must show the site's elevations, existing and proposed structures, watercourses, fill and drainage facilities, plus the lowest-floor elevation of every structure and, for floodproofed buildings, an engineer's certification.

The program administrator, appointed under Sec. 21-101, checks each application against factors listed in Sec. 21-102(d), including the danger to life and property from flooding, whether materials could wash onto other land, and the safety of emergency access, and Sec. 21-101(b)(10) bars new construction, fill or substantial improvement in an undesignated Zone A1-30 or AE floodway unless it is shown the cumulative effect will not raise the base flood elevation more than one foot. Encroachment into a mapped floodway is flatly prohibited under Sec. 21-119 unless a technical study proves no increase in flood levels, and mobile homes may never be placed in a floodway. Variances go to the program administrator first, with appeals to the Ouachita Parish Police Jury and, beyond that, to the courts (Sec. 21-103).

Violations & Fines

Building or developing in a mapped flood hazard area without the required permit, or in violation of any condition attached to one, is a misdemeanor under Sec. 21-77: a conviction carries a fine of up to $500, up to 30 days in jail, or both, for every separate violation, plus court costs, and the Police Jury may still pursue any other lawful remedy to halt the work.

Frequently Asked Questions

Do I need a permit to build in an Ouachita Parish flood zone?
Yes, if the site sits in an area of special flood hazard identified on the parish's FEMA flood insurance rate maps. Sec. 21-102(a) requires a development permit from the program administrator before any construction, fill, grading or other development begins there, and the application must include elevation data, drainage calculations and any floodproofing certification the project needs.
Can I build inside a mapped floodway in Ouachita Parish?
Not without proving it first. Sec. 21-119 prohibits fill, new construction, substantial improvements or any other development in a designated floodway unless a technical evaluation shows the project will not increase flood levels during a base flood event, and mobile homes are barred from floodways outright regardless of any study.
What is the penalty for developing in the flood hazard area without a permit?
Sec. 21-77 makes noncompliance a misdemeanor punishable by a fine of up to $500, up to 30 days in jail, or both, for each violation, plus the costs of prosecution, and the Ouachita Parish Police Jury can still take other lawful action to stop or remedy the work.

Sources & Official References

Other rules in Ouachita Parish

All Ouachita Parish rules

Compare Ouachita Parish to another location·View the Louisiana environmental rules overview

Get notified when Flood Zones in Ouachita Parish, LA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.