Key Facts
- Governing sections
- Brookhaven Code §§ 14-81, 14-83 and 14-90
- Main threshold
- 5,000 square feet of impervious surface or one acre disturbed
- Rainfall retention
- First 1.2-inch of rainfall on site
- Peak discharge control
- Pre-development rate for the 25-year, 24-hour storm
- Water quality target
- Remove at least 80 percent of total suspended solids
- Pond fencing trigger
- Storage depth greater than four feet
Summary
In the City of Brookhaven, Georgia, Article IV of Chapter 14 applies to development adding 5,000 square feet of impervious surface or disturbing one acre. Section 14-83 requires retaining the first 1.2-inch of rainfall, controlling the 25-year, 24-hour peak discharge, and a maintenance agreement, with violations enforced through the underlying permits.
(1)New development that creates or adds 5,000 square feet or greater of new impervious surface area or that involves land disturbing activity of one acre of land or greater. ... 1.Runoff reduction. ... The stormwater management system shall be designed to retain the first 1.2-inch of rainfall on the site using runoff reduction methods, to the maximum extent practicable. ... (6)Overbank flood protection. Downstream overbank flood and property protection shall be provided by controlling (attenuating) the post-development peak discharge rate to the pre-development rate for the 25-year, 24-hour return frequency storm event. ... To address a violation of this article, the City of Brookhaven shall have all the powers and remedies that are available to it for other violations of building and land disturbance permits, including without limitation the right to issue notices and orders to ensure compliance, stop work orders, and penalties as set forth in the applicable ordinances for such permits.
Full Breakdown
Article IV of Chapter 14 in the Code of the City of Brookhaven, Georgia covers post-construction stormwater management, and Section 14-79 requires compliance with the design standards of the Georgia Stormwater Management Manual (GSMM). Section 14-81 sets when the article applies: new development adding 5,000 square feet or greater of impervious surface or disturbing one acre or more; redevelopment creating, adding or replacing 5,000 square feet or more or disturbing one acre or more; any commercial or industrial hotspot land use regardless of size; any project that raises peak runoff by more than one cubic foot per second for a ten-year frequency storm; and single-family lot work creating, adding or replacing at least 3,000 square feet of impervious cover, which must provide storage and controlled release of the water quality volume or runoff reduction volume.
New development adding between 1,000 and 5,000 square feet needs only runoff reduction and water quality. Section 14-82 exempts emergency work by public agencies, utility trenches, ADA installations, and agricultural and silvicultural activities in zoned areas, among others. Section 14-83 sets the standards. The system must retain the first 1.2-inch of rainfall through runoff reduction to the maximum extent practicable, and where that is infeasible it must remove at least 80 percent of the average annual post-development total suspended solids load. Stream channel protection requires 24-hour extended detention of the one-year, 24-hour storm, and overbank flood protection holds the post-development peak discharge to the pre-development rate for the 25-year, 24-hour storm.
Live detention is sized on the 100-year rainfall. A downstream analysis runs to the point where the site is ten percent of the total drainage area. Facilities with a temporary water storage depth greater than four feet need permanent fencing at least four feet high with a maintenance gate, and detention facilities cannot sit in floodplains, wetlands, stream buffer zones, state buffer zones or transitional buffer zones. The city manager appoints the administrator under Section 14-80.
Violations & Fines
Section 14-90 treats any violation of the approved stormwater management plan during construction, failure to submit as-built drawings, failure to submit a final BMP landscaping plan, or failure of the final inspection as a violation of the underlying land disturbance permit under chapter 14 or building permit under chapter 7. The city can issue notices and orders, stop work orders, and penalties set in the ordinances for those permits.
Frequently Asked Questions
When do Brookhaven stormwater standards apply to my project?
How much rainfall must a site retain?
Do detention ponds need fencing?
What happens if I violate the stormwater plan?
Sources & Official References
Other rules in Brookhaven
Compare Brookhaven to another location·View the Georgia environmental rules overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.