Chicago, IL Environmental Rules: Stormwater Management (2026)

Significant Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified August 2026

Key Facts

Trigger threshold
15,000 sq ft disturbed or 7,500 sq ft impervious
Volume control
Capture 0.5 in. runoff or 15% reduction
Enforcing agency
Dept. of Water Management
Penalty for no plan
$5,000-$10,000 civil penalty
Residential subdivisions
Exempt from plan requirement

Summary

Chicago requires a City-approved Stormwater Management Plan for regulated developments disturbing 15,000+ sq ft or creating 7,500+ sq ft of impervious surface.

Except as provided in subsection (2), every Regulated Development shall at all times have in place a Plan approved by the City. ... Stormwater Drainage Systems shall manage the peak rate of discharge from the Regulated Development... Stormwater drainage systems shall reduce the volume of runoff... by... capture one-half inch of runoff from all impervious surfaces in accordance with volume control BMPs.

Source: Chapter 11-18 Stormwater ManagementView official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: 2026 S-74: Current through Council Journal of June 17, 2026).

Full Breakdown

Under the Chicago Stormwater Management Ordinance (MCC Ch. 11-18), any "Regulated Development", construction, excavation or grading that disturbs 15,000 or more square feet, creates 7,500 or more square feet of at-grade impervious surface, or discharges stormwater into waters or a separate sewer system, must have a City-approved Stormwater Management Plan in place at all times. The plan must address rate control (managing peak discharge), volume control (capturing one-half inch of runoff from impervious surfaces or a 15% impervious-surface reduction), sediment and erosion control, and ongoing operations and maintenance. Residential subdivision development and routine maintenance activity are exempt from the plan requirement. The Department of Water Management, under the commissioner, administers approvals, amendments, variances and site inspections.

Violations & Fines

Failure to obtain required plan approval: civil penalty of $5,000-$10,000. Other chapter violations, including violating plan conditions: $100-$1,000 per violation, with each day a separate violation; the City may also recover attorneys' fees and 3x abatement costs.

Frequently Asked Questions

Does every construction project in Chicago need a stormwater plan?
No. Only "Regulated Developments" that disturb 15,000+ sq ft, create 7,500+ sq ft of impervious surface, or discharge to waters or a separate sewer system need a plan; residential subdivisions and maintenance work are exempt.
What happens if I build without an approved stormwater plan?
You face a civil penalty of $5,000 to $10,000, plus possible attorneys' fees and triple the City's abatement costs, with each day of violation counted separately.

Sources & Official References

Other rules in Chicago

All Chicago rules

Compare Chicago to another location·View the Illinois environmental rules overview

Get notified when Stormwater Management in Chicago, IL changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Stormwater Management in Nearby Cities

How other cities in Cook County handle stormwater management.

Skokie, IL
Some Restrictions
Tinley Park, IL
Some Restrictions
Arlington Heights, IL
Some Restrictions
Schaumburg, IL
Some Restrictions
Evanston, IL
Some Restrictions
Oak Lawn, IL
Some Restrictions