Skip to main content
CityRuleLookup

Environmental Rules in Illinois (2026)

161 rules on the books across Illinois, 38 cities and counties. Select a rule to read the full details.

Severity: Few Restrictions · Light Restrictions · Some Restrictions · Significant Restrictions · Heavy Restrictions

Stormwater Management

Requirements for managing rainwater runoff on your property, including retention basins, permeable surfaces, and drainage plans.

Chicago

Significant Restrictions

Chicago requires a City-approved Stormwater Management Plan for regulated developments disturbing 15,000+ sq ft or…

Read full rule →

DuPage County

Significant Restrictions

DuPage County's Countywide Stormwater and Flood Plain Ordinance makes it unlawful to undertake development without…

Read full rule →

Mchenry County

Significant Restrictions

McHenry County requires a stormwater management permit before any regulated development, land disturbing 5,000 square…

Read full rule →

Peoria County

Significant Restrictions

Peoria County requires an Erosion, Sediment, and Stormwater Control Permit before any commercial, institutional…

Read full rule →

Arlington Heights

Some Restrictions

Arlington Heights Municipal Code Chapter 22, Article V regulates the Village's municipal separate storm sewer system…

Read full rule →

Aurora

Some Restrictions

Aurora, Illinois regulates stormwater management citywide by adopting the Kane County Stormwater Ordinance by…

Read full rule →

Bolingbrook

Some Restrictions

Any development or redevelopment inside Bolingbrook must get a stormwater permit from the village's Department of…

Read full rule →

Champaign

Some Restrictions

Champaign requires on-site stormwater detention for nonresidential development over 2 acres and residential development…

Read full rule →

Champaign County

Some Restrictions

Champaign County's Storm Water Management and Erosion Control Ordinance, adopted June 18, 2015, bars grading or filling…

Read full rule →

Cicero

Some Restrictions

New construction, building additions and any development that increases runoff in Cicero must provide stormwater…

Read full rule →

Cook County

Some Restrictions

In unincorporated Cook County, anyone tilling, clearing, filling or grading land tied to a building or special-use…

Read full rule →

Elgin

Some Restrictions

Elgin bans discharging anything but clean stormwater into its storm drain system and watercourses, and requires…

Read full rule →

Evanston

Some Restrictions

Evanston requires on-site storm water detention and release-rate control for all new developments, mandatory once a…

Read full rule →

Joliet

Some Restrictions

Joliet requires a detention facility with controlled release for new nonresidential construction over 5 acres, new…

Read full rule →

Kane County

Some Restrictions

Unincorporated Kane County requires a stormwater management permit before any development disturbs more than five…

Read full rule →

Kankakee County

Some Restrictions

Kankakee County's stormwater management ordinance keeps surface water on its existing natural course in unincorporated…

Read full rule →

Kendall County

Some Restrictions

Kendall County Code § 16-79 requires every new development in the unincorporated county to keep its site reasonably…

Read full rule →

Lake County

Some Restrictions

New subdivisions in unincorporated Lake County must meet the county's stormwater management facility standards, sizing…

Read full rule →

Macon County

Some Restrictions

In unincorporated Macon County, disturbing one acre or more of land, or any part of a larger development that totals an…

Read full rule →

Madison County

Some Restrictions

In unincorporated Madison County, anyone adding 10,000 square feet or more of impervious surface, disturbing 10,000…

Read full rule →

Mclean County

Some Restrictions

Unincorporated McLean County requires stormwater and erosion control measures on any subdivision needing public…

Read full rule →

Naperville

Some Restrictions

Naperville requires storm water systems to follow the City's Design Manual for Public Improvements and bars grading…

Read full rule →

Oak Lawn

Some Restrictions

Oak Lawn bans routing storm water, ground water or surface drainage into its sanitary sewers; downspouts, footing…

Read full rule →

Peoria

Some Restrictions

Peoria regulates stormwater through Chapter 9.5 of the city code, requiring permanent detention and volume control on…

Read full rule →

Rock Island County

Some Restrictions

In unincorporated Rock Island County, surface water must follow its natural or already-regulated course: no one may…

Read full rule →

Rockford

Some Restrictions

Rockford requires a stormwater management permit and onsite detention for most new development of a half acre or more…

Read full rule →

Sangamon County

Some Restrictions

New subdivisions in unincorporated Sangamon County must provide adequate surface drainage, storm sewers sized to county…

Read full rule →

Schaumburg

Some Restrictions

Schaumburg requires every new subdivision or development to be served by storm sewers designed for a 10-year storm…

Read full rule →

Skokie

Some Restrictions

Skokie, Illinois requires new construction and additions that add over 400 square feet or 10 percent of impermeable lot…

Read full rule →

Springfield

Some Restrictions

New Springfield subdivisions must be built with engineered surface drainage: storm sewers or open channels sized to the…

Read full rule →

St. Clair County

Some Restrictions

Unincorporated St. Clair County requires a Stormwater Management and Erosion Control Permit from the Building and…

Read full rule →

Tazewell County

Some Restrictions

Tazewell County's erosion control chapter requires permanent stormwater controls on qualifying projects to hold…

Read full rule →

Tinley Park

Some Restrictions

Village Code § 151.05 requires every development site in Tinley Park to control peak storm water discharge and reduce…

Read full rule →

Waukegan

Some Restrictions

Waukegan does not write its own stormwater code. Sec. 18-10 adopts the Lake County Watershed Development Ordinance by…

Read full rule →

Will County

Some Restrictions

Will County requires a stormwater management permit before any development that could raise flood elevations or shift…

Read full rule →

Winnebago County

Some Restrictions

New development in unincorporated Winnebago County can't release stormwater runoff faster than the land could naturally…

Read full rule →

Erosion Control

Rules to prevent soil erosion during construction and landscaping, including required sediment barriers and ground cover standards.

Illinois: statewide

StatewideHeavy Restrictions

Illinois law authorizes Soil and Water Conservation Districts to establish erosion control standards while NPDES rules…

Read full rule →

Champaign

Significant Restrictions

Champaign requires a land disturbance permit and an approved erosion and sediment control plan for construction sites…

Read full rule →

Winnebago County

Significant Restrictions

Winnebago County requires a surface water management permit before any grading, clearing, excavating, or filling on…

Read full rule →

Arlington Heights

Some Restrictions

Arlington Heights Municipal Code Section 23-106 requires every building permit's grading plan to include soil erosion…

Read full rule →

Aurora

Some Restrictions

Before issuing a building permit within any platted subdivision, Aurora, Illinois requires a signed grading agreement…

Read full rule →

Bolingbrook

Some Restrictions

Clearing, grading, stripping, excavating or filling more than 5,000 square feet, disturbing over 500 square feet within…

Read full rule →

Champaign County

Some Restrictions

Champaign County requires a Land Disturbance Erosion Control (LDEC) Permit for any land disturbance of 10,000 square…

Read full rule →

Chicago

Some Restrictions

Chicago requires a City-approved Stormwater Management Plan with sediment and erosion control measures for any…

Read full rule →

Cook County

Some Restrictions

In unincorporated Cook County, grading, filling, clearing or otherwise disturbing land tied to a building or…

Read full rule →

DuPage County

Some Restrictions

Excavating or filling any tract of unincorporated land in DuPage County requires a Building Official permit and an…

Read full rule →

Elgin

Some Restrictions

Elgin requires builders to control water runoff and erosion during construction and demolition, and to protect…

Read full rule →

Evanston

Some Restrictions

Evanston requires an approved erosion and sediment control plan before it issues a building permit for any site that…

Read full rule →

Joliet

Some Restrictions

Grading, filling, or excavation inside a mapped floodway in Joliet must follow the soil erosion and sedimentation…

Read full rule →

Kane County

Some Restrictions

Every construction site in unincorporated Kane County must keep disturbed ground below forty acres at any one time, cap…

Read full rule →

Kankakee County

Some Restrictions

Before grading starts on a construction site in unincorporated Kankakee County, § 109-351 requires silt fences…

Read full rule →

Kendall County

Some Restrictions

Kendall County Code § 16-106 requires every development site in the unincorporated county to plan erosion and sediment…

Read full rule →

Lake County

Some Restrictions

Unincorporated Lake County requires soil erosion and sediment control measures on any regulated land disturbance, with…

Read full rule →

Macon County

Some Restrictions

Any project in unincorporated Macon County that needs a land disturbance permit must file an erosion and sediment…

Read full rule →

Madison County

Some Restrictions

Any land divided in unincorporated Madison County must control erosion and sedimentation during grading under County…

Read full rule →

Mchenry County

Some Restrictions

McHenry County's Stormwater Management Ordinance makes soil erosion and sediment control mandatory on every regulated…

Read full rule →

Mclean County

Some Restrictions

McLean County's zoning construction-permit rule forces erosion and sediment control on any building site in the…

Read full rule →

Naperville

Some Restrictions

Naperville requires a detailed, engineer-sealed grading plan before issuing a building permit for a new home or…

Read full rule →

Oak Lawn

Some Restrictions

Oak Lawn's Building Code requires a maintained silt fence anywhere a construction site borders a street or sidewalk…

Read full rule →

Peoria

Some Restrictions

Peoria requires a separate erosion and sediment control permit for any land-disturbing construction, with control…

Read full rule →

Peoria County

Some Restrictions

Grading in Peoria County answers to two systems: the ILR10 stormwater permit for one-acre disturbances, and the…

Read full rule →

Rock Island County

Some Restrictions

Anyone doing construction work in unincorporated Rock Island County must use best management practices to keep sediment…

Read full rule →

Rockford

Some Restrictions

Rockford requires a stormwater management permit before disturbing more than 1,000 square feet of ground or 250 cubic…

Read full rule →

Sangamon County

Some Restrictions

Sangamon County requires an erosion control permit before grading, excavating or filling land in the unincorporated…

Read full rule →

Schaumburg

Some Restrictions

Schaumburg requires a land development permit before any clearing, grading or earth movement on a construction site…

Read full rule →

Skokie

Some Restrictions

The Village of Skokie, Cook County, Illinois, requires an Excavation and Grading permit before any work disturbs ground…

Read full rule →

Springfield

Some Restrictions

Springfield requires an erosion control permit before any construction, land disturbance over 4,000 square feet, or…

Read full rule →

St. Clair County

Some Restrictions

Any new development or land-disturbing project in unincorporated St. Clair County that disturbs an acre or more, adds…

Read full rule →

Tazewell County

Some Restrictions

Tazewell County requires an erosion and sediment control permit before disturbing land anywhere in the county's…

Read full rule →

Tinley Park

Some Restrictions

Village Code § 151.04 requires a site development permit before land in Tinley Park is cleared, graded, filled or…

Read full rule →

Will County

Some Restrictions

Will County requires construction sites to route all disturbed-area runoff through sediment control facilities before…

Read full rule →

Flood Zones

Building requirements for properties in FEMA flood zones, including elevation standards, flood insurance mandates, and construction limits.

Illinois: statewide

StatewideHeavy Restrictions

Illinois law requires state-issued permits for construction within regulatory floodways and mandates municipal…

Read full rule →

Champaign County

Heavy Restrictions

Champaign County and its cities enforce NFIP floodplain rules, and Illinois DNR requires a permit for construction in a…

Read full rule →

Cook County

Heavy Restrictions

Cook County has a Floodplain Ordinance governing development in FEMA-designated flood zones. The Metropolitan Water…

Read full rule →

Orland Park

Heavy Restrictions

Orland Park participates in FEMA's National Flood Insurance Program and has adopted floodplain regulations consistent…

Read full rule →

Peoria County

Heavy Restrictions

Peoria County and its cities enforce NFIP floodplain rules, and Illinois DNR requires a permit for construction in a…

Read full rule →

Schaumburg

Heavy Restrictions

Schaumburg has significant flood risk areas along Salt Creek and its tributaries. The Village participates in the…

Read full rule →

Cicero

Significant Restrictions

The Town of Cicero requires a separate floodplain development permit from the town engineer before any construction…

Read full rule →

DuPage County

Significant Restrictions

No development activity in unincorporated DuPage County's flood plain may worsen upstream or downstream flooding, and…

Read full rule →

Joliet

Significant Restrictions

Anyone developing land in Joliet's special flood hazard area, in either the Will County or Kendall County portion of…

Read full rule →

Kane County

Significant Restrictions

Any development inside the FEMA-mapped regulatory floodplain of unincorporated Kane County falls under the county's…

Read full rule →

Lake County

Significant Restrictions

Unincorporated Lake County bars new construction, grading, filling, or excavation in the regulatory floodplain or…

Read full rule →

Mclean County

Significant Restrictions

No one may develop in a McLean County floodplain without a development permit from the Director of Building and Zoning…

Read full rule →

Peoria

Significant Restrictions

Any development in Peoria's Special Flood Hazard Area needs a development permit from the director of public works…

Read full rule →

Rockford

Significant Restrictions

Rockford requires a floodplain encroachment permit for any development in the regulatory floodplain, and bars projects…

Read full rule →

Tinley Park

Significant Restrictions

Village Code § 152.20 allows development or filling in a mapped flood fringe only if it is protected against the base…

Read full rule →

Winnebago County

Significant Restrictions

Any construction, fill, grading or land subdivision in a Winnebago County flood hazard area needs written clearance…

Read full rule →

Arlington Heights

Some Restrictions

Arlington Heights, Illinois requires a Village development permit before any construction, fill, grading, or land…

Read full rule →

Aurora

Some Restrictions

Aurora ties flood-hazard construction directly to Chapter 18 of the municipal code, and its Building and Residential…

Read full rule →

Bolingbrook

Some Restrictions

Bolingbrook adopts the Will County Stormwater Management Ordinance (WCSMO) village-wide under Code Sec. 16-85, but…

Read full rule →

Champaign

Some Restrictions

No one may start any development in a Champaign special flood hazard area without first obtaining a development permit…

Read full rule →

Chicago

Some Restrictions

Chicago requires a flood-control permit and elevation compliance for any development valued over $1,000 in a designated…

Read full rule →

Des Plaines

Some Restrictions

Des Plaines participates in NFIP. The Des Plaines River runs through the city and portions are in FEMA flood hazard…

Read full rule →

Elgin

Some Restrictions

Elgin regulates floodplain development under Title 21, adopting the Kane County Stormwater Management Ordinance with…

Read full rule →

Evanston

Some Restrictions

Any new construction, substantial improvement, or watercourse alteration in Evanston's floodplain requires a floodplain…

Read full rule →

Kankakee County

Some Restrictions

In unincorporated Kankakee County no one may begin construction, filling, grading, or any other development in the…

Read full rule →

Kendall County

Some Restrictions

Unincorporated Kendall County bars any development inside a mapped floodplain until the Floodplain Administrator issues…

Read full rule →

Macon County

Some Restrictions

Anyone developing land in a Macon County floodplain, from grading to new construction, needs a development permit from…

Read full rule →

Madison County

Some Restrictions

Anyone developing land in a mapped floodplain within unincorporated Madison County must first obtain a development…

Read full rule →

Mchenry County

Some Restrictions

Unincorporated McHenry County adopts the International Building Code's flood-load rules, but routes every real…

Read full rule →

Naperville

Some Restrictions

Naperville doesn't write its own floodplain code - City Code § 5-6-1 adopts the DuPage Countywide Stormwater and…

Read full rule →

Oak Lawn

Some Restrictions

Any development in Oak Lawn's flood-prone areas needs a development permit from the Office of Quality Control, and fill…

Read full rule →

Rock Island County

Some Restrictions

In unincorporated Rock Island County, no one may start development in a mapped floodplain without a permit from the…

Read full rule →

Sangamon County

Some Restrictions

Any development in Sangamon County's unincorporated floodplain needs a Floodplain Development Permit from the Executive…

Read full rule →

Skokie

Some Restrictions

Skokie participates in the National Flood Insurance Program and enforces floodplain development regulations under its…

Read full rule →

Springfield

Some Restrictions

Springfield requires any building in the floodplain to sit at or above the flood protection elevation before…

Read full rule →

St. Clair County

Some Restrictions

St. Clair County requires a floodplain development permit from the Zoning Director before any grading, filling, or…

Read full rule →

Tazewell County

Some Restrictions

Tazewell County requires a development permit from the Floodplain Administrator before any construction, fill, or…

Read full rule →

Waukegan

Some Restrictions

Waukegan regulates grading, subdivision, and construction in its mapped floodplains through Sec. 6-92, layering…

Read full rule →

Will County

Some Restrictions

New and substantially improved homes in unincorporated Will County's regulatory floodplain must have their lowest floor…

Read full rule →

Boat Dock Permits

Permits required to build or modify boat docks, lifts, and davits on waterfront properties, including size limits, setbacks, and environmental reviews.

Chicago

Significant Restrictions

Building, altering, or repairing any dock in Chicago's harbor waterways requires a written permit from the Commissioner…

Read full rule →

Cook County

Significant Restrictions

In unincorporated Cook County, docks, piers, wharves and boat rentals sited within a mapped floodway are not permitted…

Read full rule →

Champaign

Some Restrictions

In a Champaign floodway, a boat dock is allowed without a separate city variance only if it qualifies as a "minor boat…

Read full rule →

Lake County

Some Restrictions

In unincorporated Lake County, boat docks and piers are a listed allowed use in the regulatory floodplain if the…

Read full rule →

Macon County

Some Restrictions

A minor boat dock built in a Macon County floodway does not need the county's no-rise engineering analysis if it meets…

Read full rule →

Madison County

Some Restrictions

In unincorporated Madison County's mapped floodways, a minor boat dock counts as an approved development activity…

Read full rule →

Mchenry County

Some Restrictions

Unincorporated McHenry County requires a stormwater management permit before building a boat dock on the Fox River…

Read full rule →

Mclean County

Some Restrictions

A boat dock built in the McLean County floodplain qualifies as a minor development activity without a full development…

Read full rule →

Peoria

Some Restrictions

Anyone docking a boat along Peoria's Illinois River bank, seawall or marina slips needs a permit or docking ticket from…

Read full rule →

Rock Island County

Some Restrictions

Rock Island County lets minor boat docks in the floodway meet its flood-height standard without a full engineering…

Read full rule →

Sangamon County

Some Restrictions

A minor boat dock built in Sangamon County's floodway skips the individual IDNR/OWR permit other work needs if it meets…

Read full rule →

Springfield

Some Restrictions

Minor boat docks in a Springfield floodway are allowed without a separate city flood-height review only if they meet…

Read full rule →

St. Clair County

Some Restrictions

Building a boat dock in unincorporated St. Clair County requires a floodplain development permit from the Zoning…

Read full rule →

Will County

Some Restrictions

In unincorporated Will County, boat docks, boathouses and piers are allowed within required wetland and stream buffer…

Read full rule →

Flood Elevation Requirements

FEMA NFIP minimum base flood elevation (BFE) construction standards for properties in mapped flood zones, including freeboard requirements above BFE.

Joliet

Significant Restrictions

Joliet adds one foot of freeboard on top of the base flood elevation to set the flood protection elevation, and the…

Read full rule →

Kane County

Significant Restrictions

In unincorporated Kane County, any building in the regulatory floodplain must be elevated or floodproofed to the Flood…

Read full rule →

Mclean County

Significant Restrictions

New buildings in McLean County's floodplain must have their lowest floor, including any basement, built at or above the…

Read full rule →

Peoria

Significant Restrictions

Peoria requires buildings in the flood hazard area to sit at or above the flood protection elevation (FPE): base flood…

Read full rule →

Arlington Heights

Some Restrictions

Arlington Heights, Illinois adds a one-foot freeboard buffer above the FEMA base flood elevation before any building in…

Read full rule →

Bolingbrook

Some Restrictions

Detention basins built under Bolingbrook's stormwater rules must keep at least one foot of freeboard between the…

Read full rule →

Champaign

Some Restrictions

Champaign measures floodplain protection against the base flood elevation set by the State Water Survey's Floodplain…

Read full rule →

Chicago

Some Restrictions

Chicago's flood control code sets a flood protection elevation one foot above the base flood elevation, and new…

Read full rule →

Cook County

Some Restrictions

In unincorporated Cook County, new and substantially improved buildings in flood zones must set the lowest floor at or…

Read full rule →

DuPage County

Some Restrictions

Unincorporated DuPage County requires one foot of freeboard above the base flood elevation for any new construction in…

Read full rule →

Elgin

Some Restrictions

Elgin's stormwater code sets the base flood elevation from FEMA's Cook and Kane County flood maps and requires two feet…

Read full rule →

Evanston

Some Restrictions

New and substantially improved residential buildings in Evanston's mapped floodplain must have their lowest floor…

Read full rule →

Kankakee County

Some Restrictions

In unincorporated Kankakee County, any new building in the mapped floodplain must be protected below the flood…

Read full rule →

Kendall County

Some Restrictions

In unincorporated Kendall County, any new construction or substantial improvement in the regulatory floodplain must…

Read full rule →

Lake County

Some Restrictions

New homes in unincorporated Lake County floodplains must have their lowest floor built up to the Flood Protection…

Read full rule →

Macon County

Some Restrictions

Macon County requires one foot of freeboard above the base flood: the county's flood protection elevation is defined as…

Read full rule →

Madison County

Some Restrictions

In unincorporated Madison County, new construction in a mapped floodplain must sit at least one foot above the base…

Read full rule →

Mchenry County

Some Restrictions

In unincorporated McHenry County, new buildings, additions and substantial improvements inside a mapped floodplain must…

Read full rule →

Oak Lawn

Some Restrictions

Oak Lawn requires new construction and substantial improvements in flood hazard areas to raise the lowest floor to the…

Read full rule →

Peoria County

Some Restrictions

Peoria County requires new buildings and substantial improvements in a mapped floodplain to sit above the flood…

Read full rule →

Rock Island County

Some Restrictions

Rock Island County requires new and substantially improved buildings in the floodplain to sit above a defined flood…

Read full rule →

Rockford

Some Restrictions

Rockford requires new and substantially improved buildings in the floodplain to sit at least two feet above the base…

Read full rule →

Sangamon County

Some Restrictions

Sangamon County defines the flood protection elevation as the base flood elevation plus one foot, and floodplain…

Read full rule →

Schaumburg

Some Restrictions

Schaumburg ties new construction in the floodplain to the base flood elevation from the Cook and DuPage County flood…

Read full rule →

Springfield

Some Restrictions

Springfield defines the flood protection elevation as the base flood elevation plus one foot of freeboard, and requires…

Read full rule →

St. Clair County

Some Restrictions

St. Clair County sets its flood protection elevation, the height a building must clear, at the base flood elevation…

Read full rule →

Tazewell County

Some Restrictions

Tazewell County's floodplain code sets a Flood Protection Elevation two feet above the base flood elevation, and…

Read full rule →

Tinley Park

Some Restrictions

Village Code § 152.03 sets the base flood elevation for Tinley Park from the FEMA flood insurance studies for Cook…

Read full rule →

Waukegan

Some Restrictions

Waukegan sets its regulatory flood protection elevation 2.5 feet above the mapped high-water profile, and Sec. 6-131…

Read full rule →

Will County

Some Restrictions

Will County requires new and substantially improved residential structures in the regulatory floodplain to elevate…

Read full rule →

Winnebago County

Some Restrictions

New and improved buildings in Winnebago County's floodplain must have their lowest usable space at least one foot above…

Read full rule →