Rockford, IL Environmental Rules: Flood Elevation Requirements (2026)
Key Facts
- Freeboard requirement
- BFE plus 2 feet
- Applies to
- new builds, substantial improvements, repairs
- Governing chapter
- Code of Ordinances Ch. 109, Art. II
- Lowest floor standard
- at or above FPE
- Non-residential alternative
- engineer-certified dry floodproofing
Summary
Rockford requires new and substantially improved buildings in the floodplain to sit at least two feet above the base flood elevation.
FPE or flood protection elevation means the BFE plus two feet of freeboard for structures at any given location in the floodplain. ... all buildings located in the floodplain shall be protected from flood damage below the flood protection elevation. ... The lowest floor (including basement) shall be at or above the flood protection elevation.
Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 18).
Full Breakdown
The city defines the flood protection elevation (FPE) as the base flood elevation (BFE) plus two feet of freeboard. Under Sec. 109-47, any new building, substantial improvement, or repaired substantially-damaged structure in the regulatory floodplain must have its lowest floor, including basement, at or above the FPE. Buildings can comply by fill, elevation on stilts/walls/piles, or an elevated crawlspace, and all electrical, heating, and utility equipment must also sit above the FPE. Non-residential buildings may instead be dry floodproofed to that same elevation if certified by a licensed engineer or architect. Manufactured homes and long-term travel trailers face the same elevation-or-tie-down requirements, and even accessory garages/sheds in the floodplain must be built of flood-resistant materials below the base flood elevation.
Violations & Fines
Building without meeting FPE standards is a code violation subject to Chapter 109's enforcement provisions, including stop-work orders, fines, and required retrofits; substantially damaged non-conforming structures must be brought into compliance within 24 months.
Frequently Asked Questions
How much freeboard does Rockford require above base flood elevation?
Does this apply to detached garages and sheds?
Sources & Official References
Other rules in Rockford
Compare Rockford to another location·View the Illinois environmental rules overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.