Macon County, IL Environmental Rules: Erosion Control (2026)
Key Facts
- Plan required for
- any land disturbance permit site
- Inspection frequency
- every 7 days, and after 0.5in storms
- Sediment cleanup
- same work day, by shovel or broom
- Governing manual
- county BMP manual, Sec. 152.35
- Penalty
- $50-$500 per offense, Sec. 152.99
Summary
Any project in unincorporated Macon County that needs a land disturbance permit must file an erosion and sediment control plan, sealed by a qualified person, showing how the site will keep soil and sediment from washing onto streets and into drainage ways. Crews must clear tracked-out sediment by day's end and inspect disturbed ground weekly.
(A) The erosion and sediment control plan shall accurately describe the potential for soil erosion and sedimentation problems resulting from land disturbing activity and shall explain and illustrate the measures that are to be taken to control these problems. The length in time and the complexity of the plan is to be commensurate with the size of the project, severity of the site condition, and potential for off-site damage. The plan shall be sealed by a qualified person. ... Soil, sediment, and debris brought onto streets and public ways must be removed by the end of the work day by machine, broom, or shovel to the satisfaction of the County Planning and Zoning Department. Failure to remove the sediment, soil, or debris shall be deemed a violation of this chapter; ... Requirement that qualified personnel shall inspect disturbed areas of the construction site that have not been finally stabilized, structural control measures, and locations where vehicles or equipment enter or exit the site at least once every seven calendar days and within 24 hours of the end of a storm that is one-half inch or greater or equivalent snowfall.
Full Breakdown
35. Required content includes a topographic map with five-foot or smaller contour intervals, existing drainage ways and floodplains, tree preservation details, the limits of clearing, grading and filling, proposed drainage networks and drain tile sizing, and a construction-sequence schedule tied to the grading and sedimentation work. The plan must specify rock pads, wash-down pads and settling basins at road access points, and crews must keep soil, sediment and debris off streets and public ways at a level acceptable to the Planning and Zoning Department; any sediment tracked onto a public way has to be removed by machine, broom or shovel by the end of the work day, or it stands as a separate violation of the chapter.
Once work starts, qualified personnel must inspect disturbed areas that have not been finally stabilized, along with structural control measures and vehicle entry and exit points, at least once every seven calendar days and again within 24 hours after any storm of one-half inch or more, or equivalent snowfall. These requirements sit inside the same Chapter 152 Stormwater Management Ordinance that governs land disturbance permits, so a subdivision or commercial site plan has to satisfy both the permit threshold and this plan content together.
Violations & Fines
Failing to remove tracked-out sediment by the end of the work day, or otherwise violating the approved erosion and sediment control plan, is a violation of Chapter 152 subject to the same Section 152.99 penalty as other stormwater violations: $50 to $500 per offense, with each day of a continuing violation charged separately, plus a possible stop work order from the county.
Frequently Asked Questions
Who has to file an erosion and sediment control plan in unincorporated Macon County?
How often must a construction site be inspected for erosion problems?
What if mud gets tracked onto a public road from a job site?
Sources & Official References
Other rules in Macon County
Compare Macon County to another location·View the Illinois environmental rules overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.