Sangamon County, IL Environmental Rules: Flood Zones (2026)
FEMA flood zone rules in Sangamon County, IL, also called floodplain regulations or special flood hazard area (SFHA) rules, determine flood insurance requirements and elevation standards for new construction.
Key Facts
- Permit required
- Before any floodplain development starts
- Application fee
- $100 ($200 if work already begun)
- Permit lifespan
- Expires if unused within 6 months
- Penalty
- $25-$500 fine per day
- Issuing authority
- Executive Director, Regional Planning Commission
Summary
Any development in Sangamon County's unincorporated floodplain needs a Floodplain Development Permit from the Executive Director before work starts, with fees, inspections and a $25-$500 fine for skipping it.
No person, firm, corporation, or governmental body not exempted by state law shall commence any development in the floodplain without first obtaining a floodplain development permit from the Executive Director. The Executive Director shall determine if a floodplain development permit shall be issued based upon the standards and requirements provided herein in Sections 16.72.120, 16.72.130, and 16.72.140 and if all appropriate information and findings required by this ordinance are submitted and established. If the proposed development fails to meet these requirements, the executive director shall not issue a floodplain development permit.
The application form for a floodplain development permit, available from the Executive Director, shall be accompanied by drawings of the site, drawn to scale showing property line dimensions; existing grade elevations and all changes in grade resulting from excavation or filling; the location and dimensions of all buildings and additions to buildings; and the elevation of the lowest floor (including basement) of all proposed buildings subject to the requirements of Section 16.72.130 of this chapter. Upon receipt of an application for a floodplain development permit, the Executive Director shall compare the elevation of the site to the base flood elevation. The Executive Director shall maintain documentation of the existing ground elevation at the development site and the base flood elevation.
Full Breakdown
The county's Special Flood Hazard Area ordinance, enacted under 55 ILCS 5/5-1041 and covering unincorporated Sangamon County, requires anyone building, filling, grading or placing a structure in the floodplain to get a Floodplain Development Permit from the Executive Director of the Springfield-Sangamon County Regional Planning Commission first. The $100 application fee jumps to $200 if work starts before the permit issues, and the permit expires if work hasn't begun within six months. The Executive Director checks the project against base-flood-elevation, building-protection and damage-prevention standards before approving or rejecting it.
Violations & Fines
Building without a permit, or violating permit conditions, draws a $25 to $500 fine per day the violation continues, plus a circuit court injunction and possible flood-insurance suspension for willful violations.
Frequently Asked Questions
Does Sangamon County's floodplain permit apply inside Springfield?
How much does a floodplain development permit cost?
Sources & Official References
Other rules in Sangamon County
Compare Sangamon County to another location·View the Illinois environmental rules overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.