Cicero, IL Environmental Rules: Flood Zones (2026)
FEMA flood zone rules in Cicero, IL, also called floodplain regulations or special flood hazard area (SFHA) rules, determine flood insurance requirements and elevation standards for new construction.
Key Facts
- Permit issuer
- Town engineer
- Governing section
- Code of Ordinances § 44-34
- Penalty range
- $25.00 to $200.00 (§ 44-32)
- FIRM adoption date
- August 19, 2008
- Covered activities
- Building, fill, grading, mobile homes
Summary
The Town of Cicero requires a separate floodplain development permit from the town engineer before any construction, fill, grading or manufactured-home placement in a floodprone area. Violators face fines between $25 and $200 per offense.
No person shall erect, construct, enlarge, alter, repair, improve, move, or demolish any building or structure without first obtaining a separate permit for each building or structure from the town engineer. No manmade change to improved or unimproved real estate, including but not limited to buildings or other structures, fences, mining, dredging, filling, grading, paving, excavation, or drilling operations, shall be commenced until a separate permit has been obtained from the town engineer for each change.
Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 121).
Full Breakdown
Chapter 44, Article II governs floodplain development townwide. Section 44-34 requires a permit from the town engineer before anyone erects, constructs, enlarges, alters, repairs, improves, moves or demolishes a building or structure, and separately before any manmade change to land, including fences, mining, dredging, filling, grading, paving, excavation or drilling, and before placing any manufactured home. Each building, structure or mobile home needs its own permit application, reviewed under Section 44-35. The town engineer, under Sections 44-36 and 44-37, examines whether a proposed site is reasonably safe from flooding and, if it sits in a floodprone area, requires new construction to be anchored against flotation and lateral movement, built with flood-resistant materials, and designed so mechanical and electrical equipment stays out of floodwater.
Subdivision proposals get the same scrutiny under Section 44-38, and new water and sewer systems in floodprone areas must be designed to keep floodwater out under Sections 44-39 and 44-40. Section 44-41 blocks approval of development in a special flood hazard area outside the current corporate limits unless it complies with the town's floodplain ordinance and federal standards. The town formally adopted FEMA's Flood Insurance Rate Maps and Flood Insurance Study for Panel J, Cook County, effective August 19, 2008, under Section 44-42, which is what defines the mapped special flood hazard areas the permit requirement applies to.
Violations & Fines
Section 44-32 sets the penalty for any violation of the floodplain article at not less than $25.00 nor more than $200.00 upon conviction, and Section 44-33 confirms the article does not override tougher deed restrictions or covenants that already apply to the same property.
Frequently Asked Questions
Do I need a permit to build in a Cicero floodplain?
What is the fine for violating Cicero's floodplain ordinance?
Which flood maps does Cicero use?
Sources & Official References
Other rules in Cicero
Compare Cicero to another location·View the Illinois environmental rules overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.
Flood Zones in Nearby Cities
How other cities in Cook County handle flood zones.