Joliet, IL Environmental Rules: Erosion Control (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Scope
grading, filling, excavation in the floodway
Vegetation clearing limit
15 days before construction
Soil stabilization deadline
15 days after final grade
Vegetated buffer
at least 25 feet along channels
Reference standard
Illinois "Green Book" / Urban Manual
Correction window
10 days after written notice
Continuing violation
separate offense each day

Summary

Grading, filling, or excavation inside a mapped floodway in Joliet must follow the soil erosion and sedimentation control criteria in City Code Section 8-507(5)k. Natural vegetation can't be cleared more than 15 days before work starts, exposed soil needs stabilization within 15 days of reaching final grade, and sediment-control devices like filter fences and check dams must go in before major grading begins.

Soil erosion and sedimentation measures. For all activities in the floodway, including grading, filling and excavation, in which there is potential for erosion of exposed soil, soil erosion and sedimentation control measures shall be employed consistent with the following criteria:1.The construction area shall be minimized to preserve the maximum vegetation possible. Construction shall be scheduled to minimize the time soil is exposed and unprotected. In no case shall the existing natural vegetation be destroyed, removed, or disturbed more than fifteen (15) days prior to the initiation of improvements.2.Temporary and/or permanent soil stabilization shall be applied to denuded areas as soon as possible. As a minimum, soil stabilization shall be provided within fifteen (15) days after final grade is reached on any portion of the site, and with fifteen (15) days to denuded areas which may not be at final grade but will remain undisturbed for longer than sixty (60) days.3.Sedimentation control measures shall be installed before any significant grading or filling is initiated on the site to prevent the movement of eroded sediments off site or into the channel.

Source: Joliet Code Chapter 8, Article X - Stormwater and GradingView official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 200).

Full Breakdown

Joliet's erosion and sediment control standard for floodway construction lives in Section 8-507, the article governing occupation and use of identified floodways within Chapter 8's flood damage prevention rules. Subsection (5)k requires that for any grading, filling, or excavation in the floodway where exposed soil could erode, the developer minimize the construction area, schedule work to limit how long soil sits exposed, and never disturb existing natural vegetation more than 15 days before starting improvements. Denuded ground must get temporary or permanent stabilization within 15 days of reaching final grade, and the same 15-day stabilization deadline applies to any denuded area that won't be at final grade but will otherwise sit undisturbed for more than 60 days.

Sediment control, using devices such as filter fences, straw bale fences, check dams, diversion ditches, or sediment traps and basins, has to be installed before any significant grading or filling starts so eroded material can't leave the site or reach the channel. The same subsection calls for a vegetated buffer strip of at least 25 feet along existing channels where practical and ties the whole standard to the "Procedures and Standards for Urban Soil Erosion and Sedimentation Control in Illinois" (the 1988 "Green Book") and the Illinois Urban Manual.

Because this standard sits inside the floodway article, it applies to work within the mapped regulatory floodway rather than every construction site citywide; those developments also need the floodway development permit required elsewhere in the same article. Joliet's floodway maps cover both counties the city spans: Section 8-514 ratifies FEMA's flood insurance rate map effective February 15, 2019, for the Will County portion of the city and the January 8, 2014 panels for the Kendall County portion.

Violations & Fines

Under Section 8-513, the city manager or designee who finds a violation must notify the owner in writing. If the owner doesn't correct it within 10 days, the city can seek a circuit court injunction, apply the general penalty set in Code Section 1-8 for each offense, and treat every additional day the violation continues as a separate offense. The city may also record a notice of violation against the property's title and warn the owner that flood insurance coverage could be suspended.

Frequently Asked Questions

What erosion control does Joliet require for floodway construction?
City Code Section 8-507(5)k requires soil erosion and sedimentation control on every floodway grading, filling, or excavation project. The construction area must stay minimized, natural vegetation cannot be disturbed more than 15 days before work starts, and exposed soil needs stabilization within 15 days of reaching final grade or after 60 days of inactivity.
What sediment control devices satisfy Joliet's floodway rule?
The code lists filter fences, straw bale fences, check dams, diversion ditches, and sediment traps and basins as acceptable devices, and requires them installed before any significant grading or filling begins so eroded sediment can't reach the site's edge or a nearby channel.
Does this erosion rule apply outside the floodway?
No. Section 8-507 governs the regulatory floodway specifically, inside the city's flood damage prevention article. Work outside a mapped floodway isn't covered by this section, though separate stormwater and site development permit rules under Chapter 31 may still apply to the same project.
What happens if a Joliet floodway project skips erosion control?
Under Section 8-513, the city manager or designee issues written notice of the violation. If it isn't corrected within 10 days, the city can seek a circuit court injunction, impose the general penalty under Code Section 1-8 for each day the violation continues, and record a notice of violation against the property's title.

Sources & Official References

Other rules in Joliet

All Joliet rules

Compare Joliet to another location·View the Illinois environmental rules overview

Get notified when Erosion Control in Joliet, IL changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.