Joliet, IL Environmental Rules: Stormwater Management (2026)
Key Facts
- Nonresidential trigger
- over 5 acres
- Residential trigger
- over 10 acres
- Impervious-cover trigger
- 60% or more
- Design storm
- 100-year frequency, rational method
- Release cap
- near natural, undeveloped runoff rate
- Reviewing official
- Director of Public Works
- Maintenance cost
- owner's responsibility, not the city's
Summary
Joliet requires a detention facility with controlled release for new nonresidential construction over 5 acres, new residential development over 10 acres, and any site reaching 60 percent impervious cover. City Code Section 31-204 sizes these facilities to the 100-year storm using the rational method and caps outflow near natural, undeveloped runoff rates, with the Director of Public Works reviewing every design.
The stormwater detention regulations set forth in this section shall apply to all developments for which a preliminary plat has been applied for prior to December 1, 1993, or for which a preliminary plat has been approved prior to December 1, 1993, and remains valid. (a)A detention facility and controlled release of storm water runoff shall be required for the following:(1)All new construction of nonresidential developments exceeding five (5) acres;(2)All residential developments exceeding ten (10) acres;(3)All new construction and parking area improvements which have and will have impervious areas of sixty (60) percent or greater. (b)The detention facility shall be designed and calculated on the basis of the one hundred-year frequency rainfall as published by the U.S. Weather Bureau for the city, using the "rational method" of computation. (c)The rate of release of storm water from all developments shall not exceed...(3)The storm water runoff calculated from a two-year frequency rainfall, with a coefficient runoff of thirty-hundredths (0.30); unless it can be shown by detailed calculations that the capacity of the outlet channel serving the area is greater.
Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 200).
Full Breakdown
Chapter 31, Article V, Division 4 of the Joliet City Code sets the city's stormwater detention standards. Section 31-204 lays out the numeric triggers still on the books: a detention facility and controlled release are required for any new nonresidential development over 5 acres, any new residential development over 10 acres, and any new construction or parking-area improvement that pushes impervious cover to 60 percent or more, measured against the entire parcel where the improvement touches land developed before October 2, 1973. S. 30 runoff coefficient.
The Director of Public Works reviews and approves detention methods, discharge-restriction methods, and supporting calculations, and can waive detention for a new storm sewer extension if an adequate outfall or downstream retention facility already exists or is planned. Under subsection (h), a building permit will not issue until the applicant proves to the Director's satisfaction that construction will meet these terms. Section 31-204 itself only governs developments whose preliminary plat was filed or approved before December 1, 1993. For everything built since, Section 31-205 adopts the stormwater detention regulations effective that date, and Sections 31-206 and 31-207 adopt the city's site development permit and design and operation standards, all by reference to Ordinance No.
10323; none of that later text is reproduced in the code itself, it is kept on file and available for inspection in the office of the city clerk. If the detention facility later falls into disrepair and threatens public health, safety, or welfare, subsection (e) lets the city pursue any court proceeding needed to recover the cost of restoring it, at the owner's expense, since maintenance is the owner's obligation, not the city's.
Violations & Fines
Section 31-204 ties compliance to the building permit: subsection (h) blocks permit issuance until the Director of Public Works confirms the design meets the detention and release standards. If an owner lets an approved facility deteriorate and it threatens public health or safety, subsection (e) authorizes the city to go to court and recover, from the owner, every dollar it spends restoring the facility to the plans the city originally approved.
Frequently Asked Questions
What triggers a stormwater detention requirement in Joliet?
How is a Joliet detention facility sized?
Who maintains a detention pond after it's built?
Do Joliet's 1993 detention rules still apply to my project?
Sources & Official References
Other rules in Joliet
Compare Joliet to another location·View the Illinois environmental rules overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.